Bursa-Hamitler Landfill Gas Collection and Energy Utilization Project
Waste Management · Landfill Methane · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard Validation Report – Bursa-Hamitler Landfill Gas Collection and Energy Utilization Project, DNV Report No. 2012-9757Download →verification · hosted copy · 2 KB
- ACM0001: Flaring or Use of Landfill Gas – CDM Methodology DocumentationDownload →methodology · hosted copy · 1 KB
- GS Passport_18-12-2013.pdf (Preliminary Review)Open →other · source link
- GS Passport_18.12.2013_v5.pdf (Preliminary Review)Open →other · source link
- PDD_18-12-13.pdf (Preliminary Review)Download →pdd · hosted copy · 997 KB
- T-V4.0-Deviation-Request-GS_1068_V.1(1).pdf (Preliminary Review)Open →other · source link
- (1)Monitoring Report_1st monitoring period_19.05.2012 to 31.12.2013_v7.doc (Performance Review no. 1)Download →monitoring · hosted copy · 1,084 KB
- (1)Verification Report_1st monitoring period_19.05.2012 to 31.12.2013_v1.3Aa.pdf (Performance Review no. 1)Download →verification · hosted copy · 867 KB
- DEV_639.pdf (Performance Review no. 3)Open →other · source link
- FVR_GS 1068_v6.0_CL.pdf (Performance Review no. 3)Download →verification · hosted copy · 867 KB
- GS1068_SDG-Impact-Tool_V1.0_15.10.2024.xlsx (Performance Review no. 3)Open →other · source link
- GS1068_Project-Annual-Report-Form.pdf (Performance Review no. 3)Open →other · source link
- GS1068_Project-Annual-Report-Form_2023.docx (Performance Review no. 3)Open →other · source link
- GS1068_Verification ER_Sheet_V5.0_10.03.2025.xlsx (Performance Review no. 3)Download →verification · hosted copy · 79 KB
- MR_GS1068_MP1_v8.0_CL.pdf (Performance Review no. 3)Download →monitoring · hosted copy · 1,221 KB
- T-V4.0-Deviation-Request-GS_1068_V.1.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- FVR GS VAL-GS RCP_GS 1068.pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 2,221 KB
- GS1068_V1.0_IQ_SDG-Impact-Tool_V02.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS1068-Bursa Hamitler_PDD_V13.7_clean.docx (Crediting Period Renewal no. 1)Download →pdd · hosted copy · 2,100 KB
- GS1068-Transition Annex_V03_clean.docx (Transition Review)Open →other · source link
- GS 1068 Annual Report 2024.pdf (Annual Report no. 1)Open →other · source link
- GS 1068_ Bursa Hamitler LFG_ Annual Report.pdf (Annual Report no. 2)Open →other · source link
- GS 1068_ Bursa Hamitler LFG_ Annual Report for year 2023.pdf (Performance Certification | Project no. 1)Open →other · source link
- Env_Verification Report_v05_GS1068 Bursa Hamitler Landfill_Clean.pdf (Performance Certification | Project no. 1)Download →verification · hosted copy · 1,079 KB
- Bursa Hamitler LFG _ MR_v5_Clean.pdf (Performance Certification | Project no. 1)Download →monitoring · hosted copy · 1,136 KB
- Open →
- 430_V1.3_IQ_SDG-Impact-tool_ Bursa Hamitler LFG_v3.xlsx (Performance Certification | Project no. 1)Open →other · source link
- Bursa Hamitler LFG PDD_ v7_clean.pdf (Design Certification Renewal | Project no. 1)Download →pdd · hosted copy · 3,500 KB
- AMP26-GSVV-0458_GS 1068_A6.4 Design Change (PA Alignment)_v05_clean.pdf (Design Certification Renewal | Project no. 1)Open →other · source link
- GS1068_Bursa-Hamitler LFG_ER_v7.xlsx (Design Certification Renewal | Project no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Landfill Methane →- ALANDFILL GAS EXTRACTION AND ELECTRICITY GENERATION PROJECT - ISTANBUL TURKEYTürkiye
- A*Mamak Landfill Waste Management Project TurkeyTürkiye
- AEcoparque Candeias Landfill Gas ProjectBrazil
- ASanta Marta Landfill Gas (LFG) Capture for Electricity Generation ProjectChile
- ACTL Landfill Gas ProjectBrazil
- AGS3434 Uberlândia landfills I and IIBrazil