Liki Pinangawan Muaralaboh Geothermal Power Plant
Renewable Energy · Geothermal · Indonesia
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM PDD: Liki Pinangawan Muaralaboh Geothermal Power Plant (ACM0002 ver.12, CDM ID 6307)Download →pdd · hosted copy · 1 KB
- CDM Validation Listing: Liki Pinangawan Muaralaboh Geothermal Power PlantDownload →other · hosted copy · 1 KB
- ADB Environmental and Social Monitoring Report (Semiannual Jan–Jun 2023), PT Supreme Energy Muara Laboh, issued 31 July 2023Open →monitoring · source link
- 280323_GS_Emission Reduction sheet.xlsx (Design Review)Open →other · source link
- Combined preliminary review validation design review for transition.pdf (Design Review)Open →verification · source link
- 04 Validation report _PRC_final(1).pdf (Design Review)Open →verification · source link
- Open →
- 01 PDD_v05.1_clean_280121.pdf (Design Review)Open →pdd · source link
- GS12112_SDG-Impact-Tool(1).xlsx (Design Review)Open →other · source link
- GS12112_SDG-Impact-Tool(2).xlsx (Performance Review no. 1)Open →other · source link
- Monitoring Report v1.7_300424.pdf (Performance Review no. 1)Open →monitoring · source link
- MR v02_141223.xlsx (Performance Review no. 1)Open →monitoring · source link
- GS 12112_Verification Report_Ver1.7_Approved_CC_8May2024.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring-Report V1.4cap_clean_120126.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- Round4_GS12112_MR v01_CAP_120126.XLSX (Performance Certification | Project no. 1)Open →monitoring · source link
- GS12112_2nd MR_SDG-Impact-tool_SEML.xlsx (Performance Certification | Project no. 1)Open →monitoring · source link
- GS 12112_Verification Report_MP2_Public_Clean_02.02.26.pdf (Performance Certification | Project no. 1)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Geothermal →- BBBProject Ulubelu Unit 3 - 4 PT. Pertamina Geothermal EnergyIndonesia
- BBBCapacity Upgrade of Gunung Salak Geothermal Power Plant Project, IndonesiaIndonesia
- BBBFajina Geothermal Based Space Heating SystemChina
- BBBWayang Windu Phase 2 Geothermal Power ProjectIndonesia
- BBBChangdao Geothermal Central Heating SystemChina
- BBBLuohe Geothermal Based Space Heating SystemChina