Project Ulubelu Unit 3 - 4 PT. Pertamina Geothermal Energy
Renewable Energy · Geothermal · Indonesia
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Project Design Document – Project Ulubelu Unit 3–4 PT. Pertamina Geothermal Energy (approved 16 Aug 2020, 890 KB)Download →pdd · hosted copy · 0 KB
- PDD Appendix 1 – ER and IRR Calculations (1327 KB Excel)Download →other · hosted copy · 0 KB
- Validation Report – Germanischer Lloyd (2367 KB)Download →verification · hosted copy · 0 KB
- Validation Opinion on Changes in PDDDownload →verification · hosted copy · 0 KB
- Monitoring Report: 26 Jul 2016 – 29 Feb 2020 (605 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report: 01 Mar 2020 – 31 Dec 2020 (753 KB)Download →monitoring · hosted copy · 0 KB
- CDM Project 5773 Registry Page (public metadata, accessed 25 Sep 2026)Download →other · hosted copy · 0 KB
- GS Passport 05.07.2020_v8.doc (Preliminary Review)Open →other · source link
- (4)PDD_12.06.2020_v3.2.pdf (Preliminary Review)Open →pdd · source link
- GS2297 Validation Report_30.09.2020_v2.pdf (Preliminary Review)Open →verification · source link
- GS Ver_report_ULUBELU_V.2.0_10821_clean.pdf (Performance Review no. 1)Open →other · source link
- GS2297_ER Calculation_MP01032018-29022020_Version 1.2_Ulubelu_Geothermal_ID.xlsx (Performance Review no. 1)Open →other · source link
- (1)GS2297_GS 22_MR_MP1_V12_01032018-2902020_clean.pdf (Performance Review no. 1)Open →monitoring · source link
- 5773_Ulubelu_Final verification report_v2.pdf (Performance Review no. 1)Open →verification · source link
- 5773_MR_MP26072016-29022020_Ulubelu.pdf (Performance Review no. 1)Open →monitoring · source link
- GS2297_Ulubelu_2nd_Deviation-Request-Form_APPROVED.pdf (Performance Review no. 2)Open →other · source link
- GS2297_Ulubelu Geothermal_2nd MR 01032020 to 310122020 Version 4 - Clean.pdf (Performance Review no. 2)Open →monitoring · source link
- Open →
- FVR GS VER GS_2297_BELL_3723 - Clean(1).pdf (Performance Review no. 2)Open →verification · source link
- Att04_Indonesia Grid Emission Factor - Directorate General of Electricity_2015.pdf (Design Change Review no. 1)Open →other · source link
- 30092020_GS2297_Ulubelu_Design Change Memo_Version 1.1_clean.docx (Design Change Review no. 1)Open →other · source link
- GS2297_Ulubelu_Transition-Annex_Rev_track change.pdf (Transition Review)Open →other · source link
- Open →
- 300910_52953_contract_2.pdf (Annual Report no. 1)Open →other · source link
- GS2297 GS Annual Report 2025 Ulubelu.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Geothermal →- BBBLiki Pinangawan Muaralaboh Geothermal Power PlantIndonesia
- BBBCapacity Upgrade of Gunung Salak Geothermal Power Plant Project, IndonesiaIndonesia
- BBBFajina Geothermal Based Space Heating SystemChina
- BBBWayang Windu Phase 2 Geothermal Power ProjectIndonesia
- BBBChangdao Geothermal Central Heating SystemChina
- BBBLuohe Geothermal Based Space Heating SystemChina