Dak Pone Hydropower Project
Renewable Energy · Hydropower · Viet Nam
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Dak Pone Hydropower Project – CDM Project Design Document (CDM-4550)Download →pdd · hosted copy · 1 KB
- Dak Pone Hydropower Project – Gold Standard PDD (GS1347, 0653_PDD.pdf)Download →pdd · hosted copy · 594 KB
- Dak Pone Hydropower Project – CDM Validation Report (TÜV RHEIN)Download →verification · hosted copy · 1 KB
- Dak Pone Hydropower Project – Gold Standard Validation Report (0653_Validation_report.pdf)Download →verification · hosted copy · 672 KB
- Dak Pone Hydropower Project – CP1 Monitoring Report 02 Jun 2011 – 31 Dec 2011Download →monitoring · hosted copy · 1 KB
- Dak Pone Hydropower Project – CP1 4th Monitoring Period Report (01 Apr 2016 – 01 Jun 2018, with RINA verification)Download →monitoring · hosted copy · 1 KB
- Dak Pone Hydropower Project – 3rd Crediting Period Renewal Non-Technical Description (EEC.vn, Oct 2023)Download →other · hosted copy · 76 KB
- CDM Project 4550 Registry Page (UNFCCC)Download →other · hosted copy · 1 KB
- Appendix 3 – IRR and CER Calculations (CDM-4550)Download →other · hosted copy · 1 KB
- (1)Monitoring Report_3rd monitoring period_01.07.2014 to 31.03.2016_v3.docx (Preliminary Review)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01.04.2016 to 01.06.2018_v2.2 (cdm).pdf (Preliminary Review)Open →monitoring · source link
- GS Passport 20.06.2014_v2.6.pdf (Preliminary Review)Open →other · source link
- Verification Report_2nd monitoring period_01.06.2012 to 30.06.2014_final.pdf (Preliminary Review)Open →verification · source link
- PDD 03.05.2019_v5.1.pdf (Preliminary Review)Open →pdd · source link
- PDD 29.11.2010_v2.2.pdf (Preliminary Review)Open →pdd · source link
- GS1347 Validation Report_06.02.2011_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.06.2012 to 30.06.2014_v3.pdf (Preliminary Review)Open →monitoring · source link
- GS Passport 22.11.2012_v1.pdf (Preliminary Review)Open →other · source link
- GS1347 Validation Report_17.02.2014_v1.pdf (Preliminary Review)Open →verification · source link
- (1)Verification Report_3rd monitoring period_01.07.2014 to 31.03.2016_final.doc (Preliminary Review)Open →verification · source link
- GS Passport 16.12.2013_v2.2.pdf (Preliminary Review)Open →other · source link
- Verification Report_1st monitoring period_02.06.20111 to 31.12.2011_v3.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_1st monitoring period_02.06.2011 to 31.12.2011_v1.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_4th monitoring period_01.04.2016 to 01.06.2018_v2.0Aa.pdf (Preliminary Review)Open →verification · source link
- 18-031 Dak Pone GS RCP 2019-05-11.pdf (Design Review)Open →pdd · source link
- PDD_3-5-2019_v5.1.pdf (Design Review)Open →pdd · source link
- (1)Verification Report_1st monitoring period_02.06.20111 to 31.12.2011_v3.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_02.06.2011 to 31.12.2011_v1.pdf (Performance Review no. 1)Open →monitoring · source link
- Monitoring Report_2nd monitoring period_01.06.2012 to 30.06.2014_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.06.2012 to 30.06.2014_final.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.01.2012 to 30.06.2014_v2 (cdm).pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_2nd monitoring period_01.06.2012 to 30.06.2014.pdf (Performance Review no. 2)Open →verification · source link
- (1)Verification Report_2nd monitoring period_01.01.2012 to 30.06.2014_final.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.01.2012 to 30.06.2014_v1 (cdm).pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Monitoring Report_2nd monitoring period_01.06.2012 to 30.06.2014_v3.pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_2nd monitoring period_01.01.2012 to 30.06.2014.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.06.2012 to 30.06.2014_v1.pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.07.2014 to 31.03.2016_v1.pdf (Performance Review no. 3)Open →verification · source link
- (2)Monitoring Report_3rd monitoring period_01.07.2014 to 31.03.2016_v3.docx (Performance Review no. 3)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.07.2014 to 31.03.2016.doc (Performance Review no. 3)Open →verification · source link
- (2)Verification Report_3rd monitoring period_01.07.2014 to 31.03.2016_final.doc (Performance Review no. 3)Open →verification · source link
- Monitoring Report_3rd monitoring period_01.07.2014 to 31.03.2016_v2.pdf (Performance Review no. 3)Open →monitoring · source link
- Monitoring Report_3rd monitoring period_01.07.2014 to 31.03.2016_v1.pdf (Performance Review no. 3)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01.04.2016 to 01.06.2018_v1 (GS4GG).pdf (Performance Review no. 4)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01.04.2016 to 01.06.2018_v2 (cdm).pdf (Performance Review no. 4)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01.04.2016 to 01.06.2018_v2 (GS4GG).pdf (Performance Review no. 4)Open →monitoring · source link
- (1)Monitoring Report_4th monitoring period_01.04.2016 to 01.06.2018_v2.2 (cdm).pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_4th monitoring period_01.04.2016 to 01.06.2018_v1.0Aa.pdf (Performance Review no. 4)Open →verification · source link
- (1)Verification Report_4th monitoring period_01.04.2016 to 01.06.2018_v2.0Aa.pdf (Performance Review no. 4)Open →verification · source link
- Verification Report_1st monitoring period_2nd CP_02.06.2018 to 31.08.2019_v1.1Aa.pdf (Performance Review no. 5)Open →verification · source link
- Verification Report_1st monitoring period_2nd CP_02.06.2018 to 31.08.2019_v1.2Aa.PDF (Performance Review no. 5)Open →verification · source link
- Monitoring Report_1st monitoring period_2nd CP_02.06.2018 to 31.08.2019_v2.pdf (Performance Review no. 5)Open →monitoring · source link
- Monitoring Report_1st monitoring period_2nd CP_02.06.2018 to 31.08.2019_v2 (GS4GG).pdf (Performance Review no. 5)Open →monitoring · source link
- PDD_03-05-2019_v5.1.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- Validation Report_2nd crediting period_01-06-2019 to 31-05-2026_v2.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- 04_GS Verification report-Clean.pdf (Performance Review no. 6)Open →verification · source link
- Open →
- CDM 4550_CP2_MR2_Ver 2.1.pdf (Performance Review no. 6)Open →monitoring · source link
- 01_GS 1347_CP2_MR2_Ver 2.2_20220831_Clean.pdf (Performance Review no. 6)Open →monitoring · source link
- CDM 4550_CP2_MR2_Verification Report_Version 02.pdf (Performance Review no. 6)Open →verification · source link
- GS1347 GS Annual Report 2023 (2).pdf (Performance Review no. 7)Open →other · source link
- 01_GS 1347_CP2_MR3_Ver 2.2_Clean.pdf (Performance Review no. 7)Open →monitoring · source link
- Open →
- GS Verification report_Ver 04-Clean.pdf (Performance Review no. 7)Open →verification · source link
- GS1347 Dak Pone_Annual-Report-Form.pdf (Performance Review no. 7)Open →other · source link
- 300653_52681_contract_2.pdf (Performance Review no. 8)Open →other · source link
- Open →
- GS Validation report-Ver 04_Clean.pdf (Crediting Period Renewal no. 2)Open →verification · source link
- 03_Dak Pone WPP_V1.3_IQ_SDG-Impact-tool_Ver 2.0.xlsx (Crediting Period Renewal no. 2)Open →other · source link
- 02.1_GS 1347_CP2_MP4_ER Calculation_Version 1.0.xlsx (Performance Certification | Project no. 1)Open →other · source link
- 01.1_GS 1347_CP2_MR4_Ver 1.2_Clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- 03.1_GS 1347_CP2_MP4_V1.3_IQ_SDG-Impact-Tool.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS VerR 1347_CP2_MR4_01May2023-01Jun2023_Clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS VerR 1347_CP3_MR1_02Jun2023-31Jan2025_Clean.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
- 03.2_GS 1347_CP3_MP1_V1.3_IQ_SDG-Impact-Tool.xlsx (Performance Certification | Project no. 2)Open →other · source link
- 02.2_GS 1347_CP3_MP1_ER Calculation_Version 1.0.xlsx (Performance Certification | Project no. 2)Open →other · source link
- 01.2_GS 1347_CP3_MR1_Ver 1.2_Clean.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
- GS1347 Dak Pone GS Annual Report 2025.pdf (Annual Report no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia