Za Hung Hydropower Project
Renewable Energy · Hydropower · Viet Nam
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Za Hung Hydropower Project - Project Design Document (CDM 4551, approved 14 Nov 2014 post-registration change)Download →pdd · hosted copy · 1 KB
- Za Hung Hydropower Project - Validation Report (CDM 4551, Bureau Veritas)Download →verification · hosted copy · 1 KB
- Za Hung Hydropower Project - Monitoring Report 01 Jan 2012 – 31 May 2014Download →monitoring · hosted copy · 1 KB
- Za Hung Hydropower Project - Monitoring Report 01 Jun 2014 – 30 Sep 2017Download →monitoring · hosted copy · 1 KB
- Za Hung Hydropower Project - Monitoring Report 01 Oct 2017 – 31 Dec 2018Download →monitoring · hosted copy · 1 KB
- CDM UNFCCC Project 4551 Registry Page (Za Hung Hydropower Project) – primary structured data sourceDownload →other · hosted copy · 1 KB
- EEC – Renewal of crediting period for Za Hung Hydropower (GS-CDM), incl. non-technical descriptionDownload →other · hosted copy · 77 KB
- ACM0002 ver. 12 – Consolidated baseline methodology for grid-connected electricity generation from renewable sourcesDownload →methodology · hosted copy · 1 KB
- Verification Report_1st monitoring period_01.02.2013 to 31.05.2014.pdf (Preliminary Review)Open →verification · source link
- GS Passport 11.12.2013_v1.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_1st monitoring period_01.02.2013 to 31.05.2014_v4.DOCX (Preliminary Review)Open →monitoring · source link
- Verification Report_2nd monitoring period_01.06.2014 to 30.09.2017_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_4th monitoring period_01.01.2019 to 31.12.2019_v3.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_4th monitoring period_01.01.2019 to 31.12.2019_v2.pdf (Preliminary Review)Open →verification · source link
- GS3015 Validation Report_23.01.2020_v1.2Aa.pdf (Preliminary Review)Open →verification · source link
- GS3015 Validation Report_13.11.2019_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_1st monitoring period_01.01.2012 to 31.05.2014_v2.1.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.10.2017 to 31.12.2018_v2.pdf (Preliminary Review)Open →verification · source link
- GS4GG PDD 30.07.2020_v2.1.pdf (Preliminary Review)Open →pdd · source link
- Monitoring Report_2nd monitoring period_01.06.2014 to 30.09.2017_v1.1.pdf (Preliminary Review)Open →monitoring · source link
- GS3015 Validation Report_21.10.2020_v2.0Aa.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_3rd monitoring period_01.10.2017 to 31.12.2018_v3.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_1st monitoring period_01.01.2012 to 31.05.2014.pdf (Preliminary Review)Open →verification · source link
- PDD 10.12.2019_v2.pdf (Preliminary Review)Open →pdd · source link
- (1)Verification Report_1st monitoring period_01-01-12 to 31-05-14_v2.0.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_01-01-12 to 31-05-14_v2.1.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Monitoring Report_monitoring period_01-02-2013 to 31-05-2014.DOCX (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_monitoring period_01-02-2013 to 31-05-2014.pdf (Performance Review no. 2)Open →verification · source link
- 4_GS_FVRP_RCP_2019IQ41MD_v1.2Aa_23.01.2020_Za Hung HPP.pdf (Performance Review no. 3)Open →other · source link
- (1)Monitoring Report_3rd monitoring period_01.10.2017 to 31.12.2018_v3.pdf (Performance Review no. 3)Open →monitoring · source link
- Open →
- (1)Verification Report_3rd monitoring period_01.10.2017 to 31.12.2018_v2.pdf (Performance Review no. 3)Open →verification · source link
- 6_Validation Report_2nd RCP_CDM_19IQ40MD_v1.0_Za Hung HPP.pdf (Performance Review no. 3)Open →verification · source link
- Open →
- 2020.06.05_CDM_MR_Za Hung_3rd Verification_Ver3.0.pdf (Performance Review no. 4)Open →verification · source link
- GS_3rd MR_Za Hung_02.06.2020.doc (Performance Review no. 4)Open →monitoring · source link
- GS_4th MR_Za Hung_02.06.2020.doc (Performance Review no. 4)Open →monitoring · source link
- GS Verification report- 4th MP.pdf (Performance Review no. 4)Open →verification · source link
- GS Verification report- 3rd MP.pdf (Performance Review no. 4)Open →verification · source link
- 3rd MP-Verification report.pdf (Performance Review no. 4)Open →verification · source link
- 4th MP-Verification report.pdf (Performance Review no. 4)Open →verification · source link
- Other Document 5 (4_GS_FVRP_RCP_2019IQ41MD_v1.2Aa_23.01.2020_Za Hung HPP.pdf).pdf (Crediting Period Renewal no. 1)Open →other · source link
- Other Document 4 (5_GS 3015_RCP PDD_Za Hung HPP_Ver 2.0_Za Hung HPP.pdf).pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- 01_MR2_CP2_ER Calculation_Za Hung HPP_Ver 2.0.xlsx (Performance Review no. 5)Open →monitoring · source link
- FVR_Version 2.1_Clean.pdf (Performance Review no. 5)Open →verification · source link
- GS3015 Za Hung_Annual-Report-Form.pdf (Performance Review no. 5)Open →other · source link
- 01.2_GS MR2_CP2_Za Hung HPP_3015_Ver 3.0_Clean.pdf (Performance Review no. 5)Open →monitoring · source link
- 02_CP2_MR3_ER Calculation_Za Hung HPP_Ver 2.0.xlsx (Performance Review no. 6)Open →monitoring · source link
- 01.1_GS MR3_CP2_Za Hung HPP_3015_Ver 2.2_Clean.pdf (Performance Review no. 6)Open →monitoring · source link
- 03.1_Verification Report_GS-3015_Ver 3.0_Clean.pdf (Performance Review no. 6)Open →verification · source link
- GS3015 GS Annual Report 2023.pdf (Performance Review no. 6)Open →other · source link
- GS3015 Annual Report 2024.pdf (Performance Review no. 7)Open →other · source link
- 03_GS3015_ER Spreadsheet_CP3_Ver 2.0.xlsx (Crediting Period Renewal no. 2)Open →other · source link
- 04_V1.3_IQ_SDG-Impact-tool_Ver 2.0.xlsx (Crediting Period Renewal no. 2)Open →other · source link
- 02_GS 3015_Project-Design-Document_RCP3_Ver 3.2_Clean.pdf (Crediting Period Renewal no. 2)Open →pdd · source link
- Validation Report-RCP-3_CDM-GS3015_V2.1_CC.pdf (Crediting Period Renewal no. 2)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia