*Suzhou Qizi Mountain Landfill Gas Recovery Project (300259)
Waste Management · Landfill Methane · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Renewal PDD v2.0 – Suzhou Qizi Mountain Landfill Gas Recovery Project (GS397), Gold Standard GS4GG Template T-PreReview_V1.2, completed 25 January 2021Download →pdd · hosted copy · 2,174 KB
- Non-Technical Summary – Suzhou Qizi Mountain Landfill Gas Recovery Project (GS397), Third Crediting Period, South Pole 2021Download →other · hosted copy · 958 KB
- Project Profile – Suzhou Qizi Mountain Landfill Gas Recovery Project, Climate Friendly/WWF, version 1.0, 17 June 2010Download →other · hosted copy · 3,364 KB
- 2nd Annual Report – Suzhou Qizi Mountain LFG Project (GS397), uploaded March 2022 (South Pole stakeholder page; not fetched)Download →monitoring · hosted copy · 737 KB
- PDD_21-12-2015.pdf (Preliminary Review)Download →pdd · hosted copy · 1,491 KB
- Verification Report_3rd monitoring period_01-08-10 to 31-12-11-v1.1.pdf (Preliminary Review)Download →verification · hosted copy · 1,213 KB
- Monitoring Report_4th monitoring period_01-01-2012 to 31-12-2013_v3.0.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_1st monitoring period_22-04-07 to 31-07-09_v2.0.pdf (Preliminary Review)Download →monitoring · hosted copy · 396 KB
- Transition-Annex-Suzhou_GS397_clean.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_3rd monitoring period_01-08-10 to 31-12-11-v7.0.pdf (Preliminary Review)Download →monitoring · hosted copy · 1,726 KB
- Monitoring Report_2nd monitoring period_01-08-09 to 31-07-10_v3.0.pdf (Preliminary Review)Download →monitoring · hosted copy · 402 KB
- Verification Report_3rd monitoring period_01-08-10 to 31-12-11_v1.1.pdf (Performance Review no. 1)Download →verification · hosted copy · 1,213 KB
- Monitoring Report_3rd monitoring period_01-08-10 to 31-12-11_v7.0.pdf (Performance Review no. 1)Open →monitoring · source link
- GS 397_Suzhou LFG_7th MP_FVR_20210118_approved.pdf (Performance Review no. 3)Download →verification · hosted copy · 534 KB
- Monitoring-Report-7th_v3-clean.pdf (Performance Review no. 3)Open →monitoring · source link
- Open →
- GS4GG VR Renewal of the Crediting Period - Suzhou Qizi Mountain Landfill Gas Recovery Project - track.pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 728 KB
- Open →
- Open →
- Open →
- T-V5.0-Deviation-Request-Form GS397_01(1).docx (Performance Review no. 4)Open →other · source link
- GS397 Suzhou Annual report Suzhou LFG_2022.pdf (Performance Review no. 4)Open →other · source link
- ER_Suzhou(GS397)_8th_v1.1.xlsx (Performance Review no. 4)Open →other · source link
- Suzhou_Monitoring-Report-3rd_2CP-01082020-21042021-clean.pdf (Performance Review no. 4)Open →monitoring · source link
- A SH_SYST_10722 Gs Verification Report-3rd_2CP-clean.pdf (Performance Review no. 4)Open →verification · source link
- T-V5.0-Deviation-Request-Form GS397_02(1).docx (Performance Review no. 4)Open →other · source link
- 2nd Annual report_Suzhou LFG_GS397.pdf (Performance Review no. 4)Open →other · source link
- Suzhou_Monitoring-Report-1st_3CP-22042021-30042022-clean.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 903 KB
- Annual report of Suzhou LFG(GS397)_2023.pdf (Performance Review no. 5)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Landfill Methane →- ALANDFILL GAS EXTRACTION AND ELECTRICITY GENERATION PROJECT - ISTANBUL TURKEYTürkiye
- A*Mamak Landfill Waste Management Project TurkeyTürkiye
- AEcoparque Candeias Landfill Gas ProjectBrazil
- ASanta Marta Landfill Gas (LFG) Capture for Electricity Generation ProjectChile
- ACTL Landfill Gas ProjectBrazil
- AGS3434 Uberlândia landfills I and IIBrazil