400 MW Solar Power Project at Bhadla Rajasthan
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- GS4GG_PDD_SBEnergy_V07-cleanmode.pdf — Project Design Document, 400 MW Solar Power Project at Bhadla, Rajasthan (v7, filed August 2017)Open →pdd · source link
- Gold Standard Impact Registry — Project #1455 (GS7071), 400 MW Solar Power Project at Bhadla, RajasthanDownload →other · hosted copy · 2 KB
- Gold Standard Marketplace — 400 MW Solar Power Project at Bhadla, Rajasthan, India (product page with vintage and SDG data)Download →other · hosted copy · 383 KB
- OpenTaps Open Climate Investing — Discussion #32: Independent PDD Analysis of Gold Standard Project 1455 (July 2022)Download →other · hosted copy · 390 KB
- GS4GG_PDD_SBEnergy_V01.pdf (Preliminary Review)Open →pdd · source link
- (1)GS4GG_PDD_SBEnergy_V07-cleanmode.pdf (Design Review)Download →pdd · hosted copy · 1,163 KB
- (1)FVR_GS_7071_Validation v02_cleanmode.pdf (Design Review)Download →verification · hosted copy · 1,110 KB
- MR V03_Cleanmode.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 704 KB
- GS4GG_FVR_SB Energy_Verification v02-Cleanmode.pdf (Performance Review no. 1)Download →verification · hosted copy · 799 KB
- MR V03- GS 7071_clean.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 717 KB
- (2)FVR - GS 7071-cleanmode.pdf (Performance Review no. 2)Download →verification · hosted copy · 816 KB
- FVR _GS_VER_1521_GS 7071_14.06.2022.pdf (Performance Review no. 3)Download →verification · hosted copy · 492 KB
- Annual_Report_GS7071_Oct-21.pdf (Performance Review no. 3)Open →other · source link
- MR_V02_GS7071-SB400(2).pdf (Performance Review no. 3)Download →monitoring · hosted copy · 1,001 KB
- MR_GS 7071(1).pdf (Performance Review no. 4)Download →monitoring · hosted copy · 735 KB
- ER_Sheet_GS_7071(1).xlsx (Performance Review no. 4)Open →other · source link
- FVR-GS VER GS 7071(1).pdf (Performance Review no. 4)Download →verification · hosted copy · 1,464 KB
- Annual_Report_GS7071_Oct-22-Latest.pdf (Performance Review no. 4)Open →other · source link
- GS 7071 Annual-Report-2023.pdf (Performance Review no. 5)Open →other · source link
- FVR-GS VER-Adani_GS 7071 VER_TQC 13623_Clean(1).pdf (Performance Review no. 5)Download →verification · hosted copy · 686 KB
- ER_Sheet_GS_7071_22.05.2024.xlsx (Performance Review no. 5)Open →other · source link
- Project-Annual-Report-GS7071_2022.pdf (Performance Review no. 5)Open →other · source link
- MR_GS 7071_v06_20.06.2024_Clean.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 773 KB
- MR_GS 7071_v05_22.04.2025-Clean.pdf (Performance Review no. 6)Download →monitoring · hosted copy · 1,262 KB
- VKU.F27W. Verification Report_VKU.VER.25.24_GS_7071_Clean.pdf (Performance Review no. 6)Download →verification · hosted copy · 1,764 KB
- ER_Sheet_GS_7071_v04_22.04.2025.xlsx (Performance Review no. 6)Open →other · source link
- 430_V1.1_IQ_SDG-Impact-tool_GS7071(1).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Estimated ER sheet_GS7071(2).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- IRR Calculations_SB-1(1).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- PDD_GS7071_V8.1_31122024_Clean.pdf (Crediting Period Renewal no. 1)Download →pdd · hosted copy · 3,448 KB
- IRR Calculations_SB-3(1).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- FVR_GS 7071_Clean(1).pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 1,303 KB
- Project-Annual-Report_GS7071_2023.pdf (Annual Report no. 1)Open →other · source link
- Project-Annual-Report_GS7071.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia