Renewable Solar Power Project by Adani Green Energy Limited
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Joint Project Description & Monitoring Report: 100 MW Solar Project in Bhadla in Rajasthan — VCS Version 3, v3.1 (19-Aug-2019)Download →pdd · hosted copy · 1,758 KB
- Communication Agreement_Adani.pdfOpen →other · source link
- Verra-Registry-Communications-Agreement (1) VCS 1815.pdfOpen →other · source link
- VCS 1815_ER sheet.xlsxOpen →other · source link
- Issuance Representation_1815_2025-12-30.pdfOpen →other · source link
- VCS Project Review Report 1815, Adani Solar, India Verra Response.pdfOpen →other · source link
- Verra-SDG-Contributions-Report-1815_01.01.2020 to 31.12.2020.pdfOpen →other · source link
- Verra-SDG-Contributions-Report-1815_28.09.2017 to 30.09.2018.pdfOpen →other · source link
- Verra-SDG-Contributions-Report-1815clean.pdfOpen →other · source link
- Verra-SDG-Contributions-Report_1815.pdfOpen →other · source link
- Verra-SDG-Contributions-Report_1815.pdfOpen →other · source link
- PRR_VCS_V5_15MAY2026.pdfOpen →other · source link
- VCS Project Review Report_1815 solar-02 August.pdfOpen →other · source link
- 1815 Issuance Deed.pdfOpen →other · source link
- VCS-Issuance-Representation 1815 Revised.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- VCS-Issuance-Representation_Zuvan..pdfOpen →other · source link
- VCS 1815 MR_V04 clean.pdfDownload →monitoring · hosted copy · 1,594 KB
- VCS 1815 MR V05clean[58].pdfDownload →monitoring · hosted copy · 1,354 KB
- VCS Joint PDMR_Adani_V02_11.01.2019.pdfDownload →monitoring · hosted copy · 670 KB
- VCS MR_1815_01122021-31102024_CBReviewed_07.05.2026_Clean.pdfDownload →monitoring · hosted copy · 876 KB
- VCS MR V03_TR commented - Clean Copy.pdfDownload →monitoring · hosted copy · 1,285 KB
- VCS Joint PDMR_Adani_V02_11.01.2019.pdfDownload →pdd · hosted copy · 670 KB
- VCS-Registration-Representation_Zuvan...pdfOpen →other · source link
- FVR-11918-Adani Green-Val-Ver_05.02.2019_v02.pdfDownload →verification · hosted copy · 530 KB
- 11918_VCS Validation Representation, v3.3.pdfDownload →verification · hosted copy · 1,236 KB
- FVR-11918-Adani Green-Val-Ver_05.02.2019_v02.pdfDownload →verification · hosted copy · 530 KB
- FVR-Adani Renewables_VCS 1815_ TQC_6621.pdfDownload →verification · hosted copy · 758 KB
- FVR_VCS 1815_ESPL 20.35 - Clean Copy.pdfDownload →verification · hosted copy · 1,189 KB
- FVR-VCS_VER _ADANI_VCS1815_TQC 1322_Rev03_clean-Comm.pdfDownload →verification · hosted copy · 688 KB
- VCS VerR_1815_01122021-31102024_CBReviewed_07.05.2026Clean.pdfDownload →verification · hosted copy · 1,911 KB
- 11918_VCS Verification Representation, v3.3.pdfDownload →verification · hosted copy · 1,296 KB
- VCS-Verification-Representation-v4.1 (3).pdfDownload →verification · hosted copy · 65 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 127 KB
- VCS-Ver-Representation-v4.1_VCS 1851_ESPL 20.35.pdfDownload →verification · hosted copy · 85 KB
- Verification Representation.pdfDownload →verification · hosted copy · 77 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBEnergising India using Solar Energy ProjectsIndia
- BBB400 MW Solar Power Project at Bhadla RajasthanIndia