300 MW Solar PV Plant by SBSR Power Cleantech in Rajasthan
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Solar Energy Project(s) by SB Energy Private Limited — VCS Monitoring Report v05 (VCS-1805-MP06), Feb 2024, Monitoring Period 01-Feb-2023 to 31-Aug-2023 (cross-references GS7721)Download →monitoring · hosted copy · 953 KB
- Open →
- CRISIL Rating Report — SBSR Power Cleantech Eleven Private Limited, March 2023 (confirms Adani Group ownership and financial profile)Download →other · hosted copy · 115 KB
- SolarQuarter: CERC Reduces 300 MW Rajasthan Solar Project to 150 MW, Imposes Penalties (Feb 2026)Open →other · source link
- PDD_GS_GSVAL 7721_CL(1).pdf (Design Review)Open →pdd · source link
- FVR_GS 7721_CL.pdf (Design Review)Open →verification · source link
- ER Sheet_Ver03-GS7721.xlsx (Design Review)Open →other · source link
- GS7721_MR_ clean.pdf (Performance Review no. 1)Open →monitoring · source link
- GS 7721_Annual Report.pdf (Performance Review no. 1)Open →other · source link
- Copy of ER Sheet Version_v2.xlsx (Performance Review no. 1)Open →other · source link
- GS7721_FVR_CC.pdf (Performance Review no. 1)Open →verification · source link
- 7721-Project-Annual-Report_2023.pdf (Annual Report no. 1)Open →other · source link
- 7721-Project-Annual-Report_2024.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia