180 MW Renewable Energy Project by Greenko Group
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- GS4GG Verification Report — 2x50 MW Orange Suvaan Solar Photovoltaic Power Project in Maharashtra, India (GS5928, sister project, 3rd periodic verification, monitoring period 01/02/2020–31/03/2021)Download →verification · hosted copy · 881 KB
- SCR 180 MW Solar PV.pdf (Preliminary Review)Open →other · source link
- GSVAL_180 MW PDD v.05_clean.pdf (Design Review)Open →pdd · source link
- FVR_GS_7724_Clean.pdf (Design Review)Open →verification · source link
- 2. ER Sheet GS_7724.xlsx (Performance Review no. 1)Open →other · source link
- 2. MR _180 MW_Ver-03_Clean.pdf (Performance Review no. 1)Open →monitoring · source link
- SEI verification report.pdf (Performance Review no. 1)Open →verification · source link
- DEV_791.pdf (Performance Review no. 2)Open →other · source link
- Monitoring-Report_GS 7724_ver05_Clean.pdf (Performance Review no. 2)Open →monitoring · source link
- 7724_Annual-Report.pdf (Performance Review no. 2)Open →other · source link
- FVeR_GS 7724_Clean.pdf (Performance Review no. 2)Open →other · source link
- SDG_Impact_tool V1.3_GS7724.xlsx (Performance Review no. 2)Open →other · source link
- Updated ER sheet_GS7724_ver03(1).xlsx (Performance Review no. 2)Open →other · source link
- GS 7724_SDG-Impact-tool.(2).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- VKU.F26W.Validation Report for PA_VKU.VAL.20.24_GS_7724-Clean(1).pdf (Crediting Period Renewal no. 1)Open →verification · source link
- Open →
- ER sheet_RCP_GS7724 revised .xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Project-Annual-Report_GS7724 for 2024.pdf (Annual Report no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia