250 MW Solar Power Project by Clean Solar Power Jodhpur Pvt. Ltd
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- DEV_717 Deviation Request Form – GS7761 (Crediting Period Change, approved 19/07/2024)Download →other · hosted copy · 138 KB
- DEVRQ-292 Deviation Request – GS7761 (approved 07/01/2026)Open →other · source link
- ESIA – 250 MW Solar PV Project, Noore Ki Bhoorj, Rajasthan (ERM, Oct 2019) – AIIB-financedDownload →other · hosted copy · 3,454 KB
- Open →
- GS_7761_SD-Tool.xlsx (Design Review)Open →other · source link
- EF_and_ER_Estimation.xlsx (Design Review)Open →other · source link
- GS4GG_PDD_GS 7761_Design Review-3_Clean copy(1).pdf (Design Review)Download →pdd · hosted copy · 1,482 KB
- FVR_ GS7761_Design Review-3_Clean copy.pdf (Design Review)Open →verification · source link
- Stakeholder-Consultation-Report_7761.pdf (Design Review)Open →other · source link
- DEV_717(1).pdf (Performance Review no. 1)Open →other · source link
- GS_7761-Project-Annual-Report (1).pdf (Performance Review no. 1)Open →other · source link
- GS 7761_SDG-Impact-tool_14032022-31032024.xlsx (Performance Certification | Project no. 1)Open →other · source link
- MR_GS7761_v5.0_MP1_CL.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS 7761_ER_V06_15012026.xlsx (Performance Certification | Project no. 1)Open →other · source link
- FVR_GS 7761_v1.5_CL.pdf (Performance Certification | Project no. 1)Open →verification · source link
- Annual report GS 7761.pdf (Annual Report no. 1)Open →other · source link
- (Public) FVR_ Verification Report_250 MW SPP at Bhadla_GS 7761_TQC 0726__Clean.pdf (Performance Certification | Project no. 2)Download →verification · hosted copy · 725 KB
- Open →
- MR_GS 7761_V06_Clean.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia