Niksar Hydroelectric Power Plant
Renewable Energy · Hydropower · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Feasibility Study of a Hydropower Project: Case Study of Niksar HEPP, Turkey (METU MSc Thesis, Mutlu 2010) — most detailed public technical document on the identical projectDownload →other · hosted copy · 3,053 KB
- IC İçtaş Construction — Niksar Regulator and Hydroelectric Power Plant Project PageDownload →other · hosted copy · 36 KB
- Ecological Restoration Assessment for Tokat-Niksar HPP (Springer Environmental Monitoring and Assessment, 2021)Download →other · hosted copy · 315 KB
- COMMS_AGR_PL1019_21MAR2013.pdfOpen →other · source link
- COMMS_AGR_PL1019_21MAR2013.pdfOpen →other · source link
- Declaration of Agency and Communications Agreement_Niksar HPP.pdfOpen →other · source link
- ER_Calculations_Niksar_HPP_v01_05_08_2024.xlsxOpen →other · source link
- Final_ER calculations_Niksar HES_v02_26.12.2024.xlsOpen →other · source link
- ChamberRegistryDoc.pdfOpen →other · source link
- ChamberRegistryDoc.pdfOpen →other · source link
- Generation License_Niksar HPP.pdfOpen →other · source link
- Niksar_HES-_ctas_Enerji-WUA.PDFOpen →other · source link
- Niksar_HES-_ctas_Enerji-WUA.PDFOpen →other · source link
- NiksarSOCIALCARBON_Report_v2.1Fnl.pdfOpen →other · source link
- Niksar Transfer Letter.pdfOpen →other · source link
- N_KSARElectricityLicence.pdfOpen →other · source link
- N_KSARElectricityLicence.pdfOpen →other · source link
- SC_REPORT_POINT_ONE_1019_26APR2013.pdfOpen →other · source link
- SC_REPORT_POINT_ONE_1019_26APR2013.pdfOpen →other · source link
- TradeRegistry.pdfOpen →other · source link
- TradeRegistry.pdfOpen →other · source link
- I2_PRR_1019_20211029.pdfOpen →other · source link
- VCS_CPR1_PRR_1019_10JAN2024.pdfOpen →other · source link
- VCS_PRR_1019_01NOV2021-23MAY2022.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3_Niksar 161224.pdfOpen →other · source link
- PP_ISS_REP_1019_24MAY2012_31JUL2013.pdfOpen →other · source link
- PP_ISS_REP_1019_24MAY2012_31JUL2013.pdfOpen →other · source link
- PP_ISS_REP_1019_24MAY2012_31JUL2013.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1_Niksar 2.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1_Niksar_(dated).pdfOpen →other · source link
- Final_MR_744 Niksar hydro_v04_15-09-2021.pdfDownload →monitoring · hosted copy · 855 KB
- MONIT_REP_1019_24MAY2012_31JUL2013.pdfDownload →monitoring · hosted copy · 4,006 KB
- MONIT_REP_1019_24MAY2012_31JUL2013.pdfDownload →monitoring · hosted copy · 4,006 KB
- MON_REP_1019_28April2022.pdfDownload →monitoring · hosted copy · 930 KB
- VCS MR 1019 01NOV2021 - 23MAY2022_clean.pdfDownload →monitoring · hosted copy · 959 KB
- PROJ_DESC_1019_17APR2013.pdfDownload →pdd · hosted copy · 7,398 KB
- VCS-Project-Description-v4.3_Niksar HES_v4_26.12.2024_cln.pdfDownload →pdd · hosted copy · 1,391 KB
- PP_REG_REP_1019_21MAR2013.pdfOpen →other · source link
- PP_REG_REP_1019_21MAR2013.pdfOpen →other · source link
- FVR_VCS ValR 1019 30122024_Rev 2.0Aa_[6].pdfDownload →verification · hosted copy · 719 KB
- SC_VALID_REP_POINT_ONE_1019_26APR2013.pdfDownload →verification · hosted copy · 366 KB
- VALID_REP_1019_18APR2013.pdfDownload →verification · hosted copy · 383 KB
- VALID_REP_1019_18APR2013.pdfDownload →verification · hosted copy · 383 KB
- VALID_REP_1019_18APR2013.pdfDownload →verification · hosted copy · 383 KB
- VALID_STA_1019_18APR2013.pdfDownload →verification · hosted copy · 565 KB
- Final_Ver Report_744 Niksar hydro_AnD1l SC6yler_v02_28-10-2021.pdfDownload →verification · hosted copy · 1,412 KB
- FVR_VCS VerR 1019 18122024- Rev 03Aa.pdfDownload →verification · hosted copy · 703 KB
- VerificationReport_Niksar_21222967_20130903.pdfDownload →verification · hosted copy · 693 KB
- VERIF_REP_1019_24MAY2012_31JUL2013.pdfDownload →verification · hosted copy · 693 KB
- VERIF_REP_1019_24MAY2012_31JUL2013.pdfDownload →verification · hosted copy · 693 KB
- VER_REP_1019_28April2022.pdfDownload →verification · hosted copy · 392 KB
- Signed_VCS Ver Rep_744 Niksar hydro_Christian Johannes_16-09-2021.pdfDownload →verification · hosted copy · 1,100 KB
- VCS-Verification-Representation-Niksar HPP_rev1.0A.pdfDownload →verification · hosted copy · 76 KB
- Verification-Representation-v4.2_Niksar VER_Rev01_ZEY_LS_.pdfDownload →verification · hosted copy · 207 KB
- VERIF_STA_1019_24MAY2012_31JUL2013.pdfDownload →verification · hosted copy · 658 KB
- VERIF_STA_1019_24MAY2012_31JUL2013.pdfDownload →verification · hosted copy · 658 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia