Dak Psi 3 and 4 Hydropower Project
Renewable Energy · Hydropower · Viet Nam
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Dak Psi 3 and 4 Hydropower Project — Approved Project Design Document (956 KB, approved 27 Mar 2013)Download →pdd · hosted copy · 1 KB
- Dak Psi 3 and 4 Hydropower Project — Validation-Stage PDD (656 KB, ACM0002 ver. 11, c. 2010)Download →pdd · hosted copy · 1 KB
- Dak Psi 3 and 4 Hydropower Project — Validation Report (619 KB, KEMCO)Download →verification · hosted copy · 1 KB
- Dak Psi 3 and 4 Hydropower Project — Monitoring Report 06 Nov 2011–31 Aug 2012 (149 KB)Download →monitoring · hosted copy · 1 KB
- COMMS_AGR_1031_19MAR0213.pdfOpen →other · source link
- 2_ER_DakPsi3and4-VCS_period3_v1_3.xlsxOpen →other · source link
- Transfer_Approval_25-01-2021.pdfOpen →other · source link
- V2_PRR_1031_08SEP2022.pdfOpen →other · source link
- VCS_R2_V1_PRR_1031_01JAN2015_31AUG2018.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3_DP3and4.pdfOpen →other · source link
- PP_ISS_REP_1031_09OCT2010_05NOV2011.pdfOpen →other · source link
- VCS1031_Issuance Deed of Representation_v2.pdfOpen →other · source link
- MONIT_REP_1031_09OCT2010_05NOV2011.pdfDownload →monitoring · hosted copy · 777 KB
- VCS_MR_1031_01JAN2015-31AUG2018_1_3_clean.pdfDownload →monitoring · hosted copy · 2,052 KB
- VCS_MR_DP34_v1_4_clean.pdfDownload →monitoring · hosted copy · 2,368 KB
- CDM_PROJ_DESC.pdfDownload →pdd · hosted copy · 957 KB
- PROJ_DESC_1031_27FEB2013.pdfDownload →pdd · hosted copy · 361 KB
- PP_REG_REP_1031_19MAR2013.pdfOpen →other · source link
- CDM_VALID_REP.pdfDownload →verification · hosted copy · 619 KB
- VALID_STA_1031_08MAR2013.pdfDownload →verification · hosted copy · 29 KB
- FVR CCIPL 1014 CLean.pdfDownload →verification · hosted copy · 1,180 KB
- VCS VeR 2114 01Jan2015 - 31Aug2018 2 CC.pdfDownload →verification · hosted copy · 1,532 KB
- VERIF_REP_1031_09OCT2010_05NOV2011.pdfDownload →verification · hosted copy · 232 KB
- VCS-Verification-Representation-v4.1_CCIPL 1014_v3.pdfDownload →verification · hosted copy · 339 KB
- Verification-Representation-v4.2.pdfDownload →verification · hosted copy · 137 KB
- VERIF_STA_1031_09OCT2010_05NOV2011.pdfDownload →verification · hosted copy · 33 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia