Tatar Hydro Electricity Power Plant
Renewable Energy · Hydropower · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- VCS1205 Tatar Hydro Electricity Power Plant — California AB 1305 VCMDA Disclosure (BMO Radicle, current as of 19 March 2026)Open →other · source link
- ANDRITZ Hydro — Tatar HPP Project Page (engineering specs, commissioning timeline)Download →other · hosted copy · 46 KB
- ANDRITZ Hydro Magazine No. 20 (2011) — Tatar and Pembelik ownership/construction detailsDownload →other · hosted copy · 2,082 KB
- The Communications Agreement DarenHES Tatar Pembelik.pdfOpen →other · source link
- Final_ER_VCS1205_Tatar HPP_v02_24-12-2024.xlsxOpen →other · source link
- 1205 Exemption Response Letter 8 August 2021[32].pdfOpen →other · source link
- SC_REPORT_POINT_ZERO_1205_31OCT2013.pdfOpen →other · source link
- SC_VALID_REP_1205_11NOV2013.pdfOpen →other · source link
- Tatar VCS Issuance Deed of Representation.pdfOpen →other · source link
- Tatar VCS-Issuance-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- Tatar HPP VCS-Monitoring-Report-v4.0 20.09 (4).pdfDownload →monitoring · hosted copy · 7,379 KB
- Tatar HPP VCS-Monitoring-Report-v4.0 20.09.pdfDownload →monitoring · hosted copy · 1,787 KB
- VCS1205Tatar-VCS-2nd MR.pdfDownload →monitoring · hosted copy · 944 KB
- PROJ_DESC_1205_30OCT2013.pdfDownload →pdd · hosted copy · 2,608 KB
- VCS PD 1205 28MAR2025.pdfDownload →pdd · hosted copy · 2,212 KB
- PP_REG_REP_1205_12NOV2013.pdfOpen →other · source link
- VCS1205_Registration-Representation-Single-PP-v4.4-FINAL_21.04.2025.pdfOpen →other · source link
- VALID_REP_1205_30JAN2014.pdfDownload →verification · hosted copy · 1,353 KB
- VCS ValR 1205 21Feb2025_Clean.pdfDownload →verification · hosted copy · 832 KB
- Validation-Representation-v4.2_VCS1205.pdfDownload →verification · hosted copy · 115 KB
- VALID_STA_1205_30JAN2014.pdfDownload →verification · hosted copy · 27 KB
- Final Verification Report Tatar.pdfDownload →verification · hosted copy · 882 KB
- VCS-FVR (TATAR HPP).pdfDownload →verification · hosted copy · 606 KB
- Tatar HPP - Deed.pdfDownload →verification · hosted copy · 172 KB
- VCS-Verification-Representation-v4.1Tatar .pdfDownload →verification · hosted copy · 135 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia