Grid connected electricity generation using natural gas by Lanco Kondapalli Power Limited
Industrial & Commercial · Natural Gas Electricity Generation · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Project Design Document — Grid connected electricity generation using natural gas by Lanco Kondapalli Power Private Limited (CDM Project 5554, AM0029 ver. 3)Download →pdd · hosted copy · 1 KB
- CDM Validation Report — Lanco Kondapalli Power Private Limited (TÜV NORD CERT GmbH, VVM 1.2)Download →verification · hosted copy · 1 KB
- CDM Monitoring Report — 05 Sep 2012 to 31 Dec 2012 (Applus)Download →monitoring · hosted copy · 1 KB
- CDM Monitoring Report — 01 Jan 2013 to 31 Oct 2015 (Applus; 450,821 CERs issued)Download →monitoring · hosted copy · 1 KB
- CDM Monitoring Report — 01 Nov 2015 to 31 Dec 2016 (Applus; 74,009 CERs issued)Download →monitoring · hosted copy · 1 KB
- CDM Project 5554 Registry Page — UNFCCC CDM (full metadata, issuance history, appendix links)Download →other · hosted copy · 1 KB
- CDM Validation Public Comment Record (Gautam Kumar, Mar–Apr 2010) — detailed additionality and baseline critiqueDownload →other · hosted copy · 1 KB
- Communication for 1261.pdfOpen →other · source link
- Declaration for 1261.pdfOpen →other · source link
- Issuance deed of represenation final.pdfOpen →other · source link
- VCS 1261_Lanco _Issuance Deed.pdfOpen →other · source link
- Monitoring Report_LANCO_27 Jan 2014.pdfDownload →monitoring · hosted copy · 1,210 KB
- VCS 1261 Lanco MR _v 02 11022022-AR sub.pdfDownload →monitoring · hosted copy · 881 KB
- Phase II final PDD.PDFDownload →pdd · hosted copy · 1,556 KB
- VCS Project Description, 1.0.pdfDownload →pdd · hosted copy · 365 KB
- Registration deed of representation.pdfOpen →other · source link
- 5554 FValR.pdfDownload →verification · hosted copy · 1,823 KB
- LANCO Deed.pdfDownload →verification · hosted copy · 94 KB
- FVR_Lanco Kondapalli-VCS 1261-A+32121-AR sub.pdfDownload →verification · hosted copy · 681 KB
- Gap val and Ver FVR_LANCO_dt 21 Jan 2014.pdfDownload →verification · hosted copy · 627 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 127 KB
- Verification deed_LANCO 27 Jan 2014.pdfDownload →verification · hosted copy · 103 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Natural Gas Electricity Generation →- BBBZhangjiagang Nature Gas Power Generation ProjectChina
- BBBNatural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power LimitedIndia
- BBBNanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant ProjectChina
- BBBChina Guangdong Shenzhen Qianwan LNG generation projectChina
- BBBGuangdong Huizhou LNG Power Generation ProjectChina
- BBBGrid connected electricity generation plant using natural gas at Jurong Island in SingaporeSingapore