Murat HEPP
Renewable Energy · Hydropower · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Program Guide 20 January 2022 v4.1Download →other · hosted copy · 1,224 KB
- 20 January 2022 VCS Standard v4.2Download →other · hosted copy · 2,169 KB
- Scopes & Types Voluntary Registry Offsets DatabaseDownload →other · hosted copy · 310 KB
- 1 VERRA REGISTRY USER GUIDEDownload →other · hosted copy · 1,367 KB
- FEASIBILITY STUDY OF A HYDROPOWER PROJECT: CASE STUDY OF NİKSAR HEPP, TURKEYDownload →other · hosted copy · 3,053 KB
- PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03.1. CDM – Executive BoardDownload →pdd · hosted copy · 1,752 KB
- PROJECT DESCRIPTION: VCS Version 3 v3.2 1 BÜYÜKDÜZ HYDROELECTRIC POWERDownload →pdd · hosted copy · 2,272 KB
- VERIFICATION REPORT FOR “GHANI SOLAR RENEWABLE POWER PROJECT BY GREENKO GROUP”Download →verification · hosted copy · 440 KB
- VERIFICATION REPORT: VCS Version 3 v3.4 1 VCS Verification Report TemplateDownload →verification · hosted copy · 798 KB
- Communications AgreementVCS1344.pdfOpen →other · source link
- VCS (1344)_MURAT_HEPP_ER sheet-FINAL.xlsxOpen →other · source link
- Exemption Rejection Letter_1344.pdfOpen →other · source link
- ID_1344_VCS_EXEMPTION_APPROVED_24SEPT2024.pdfOpen →other · source link
- TransferLetterVCS1344.pdfOpen →other · source link
- V2_PRR_1344_29March2022.pdfOpen →other · source link
- VCS_CPR_PRR_1344_18_May_2025 .pdfOpen →other · source link
- PDD MURAT HEPP.pdfDownload →pdd · hosted copy · 3,788 KB
- IssuenceDeedVCS 1344.pdfOpen →other · source link
- VCS Issuance Deed of Representation.pdfOpen →other · source link
- VCS Issuance Representation1344Signed.pdfOpen →other · source link
- MURAT VCS LISTING REPRESENTATION.pdfOpen →other · source link
- 1344_VCS-MR MURAT HPP 24.02_29March2022 .pdfDownload →monitoring · hosted copy · 2,422 KB
- Final_MR_320 Murat hydro_v07_12-03-2015.pdfDownload →monitoring · hosted copy · 2,876 KB
- VCS (1344)_MURAT_HEPP_MR-FINAL.pdfDownload →monitoring · hosted copy · 3,726 KB
- PDD MURAT HEPP PDD DVR- 06 PDF.pdfDownload →pdd · hosted copy · 3,786 KB
- VCS-PDD-MuratHEPP-Version1.4-Clean.pdfDownload →pdd · hosted copy · 4,284 KB
- MURAT HEPP REGISTRATION REPRESENTATION.pdfOpen →other · source link
- Registration-Representation-Single-PP-v4.4-FINAL..pdfOpen →other · source link
- 1344 - Validation report-Clean.pdfDownload →verification · hosted copy · 1,069 KB
- FVR-2011DG32MD rev1.2Aa_230414.pdfDownload →verification · hosted copy · 1,240 KB
- 1344 - Validation-Representation-v4.2.pdfDownload →verification · hosted copy · 116 KB
- VCS Validation Representation_Murat HEPP_signed.pdfDownload →verification · hosted copy · 19 KB
- 1344_Final Verification report_29March2022.pdfDownload →verification · hosted copy · 637 KB
- Final_Ver Report_320 Murat hydro_Hande SEZER_v02.1_13-03-2015.pdfDownload →verification · hosted copy · 1,724 KB
- VCS (1344)_MURAT_HEPP_FVR-FINAL.pdfDownload →verification · hosted copy · 521 KB
- Signed_VCS Verification Representation_320 Murat hydro_Christian JOHANNES_09-03-2015.pdfDownload →verification · hosted copy · 1,296 KB
- VCS1344-Verification-Representation-v4.1 (2).pdfDownload →verification · hosted copy · 83 KB
- VCS_Murat_Deed.pdfDownload →verification · hosted copy · 215 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia