Greater New Bedford LFG Utilization Project
Waste Management · Landfill Methane · United States
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Monitoring Report #2022-2 for the Greater New Bedford LFG Utilization Project (VCS Version 4.1, Period July 1 – December 31, 2022, Version 3, issued September 8, 2023)Download →monitoring · hosted copy · 6,780 KB
- Verification Report (Second Half 2022, GHD, Report No. 11203966-RPT-5)Download →verification · hosted copy · 906 KB
- Commonwealth New Bedford Energy LLC – Carbon Offsets Program Overview (crmcx.com, updated June 2026)Download →other · hosted copy · 134 KB
- Greater New Bedford LFG Utilization Project – Terrapass Project Page (with links to monitoring and verification reports)Download →other · hosted copy · 286 KB
- CRMC and CNBE Communications Agreement 10 Oct 23.pdfOpen →other · source link
- VCS ER Calculation Spreadsheet - project 138 01Jan23 to 30Spt23 (11March2024) V2.xlsxOpen →other · source link
- VCS ER Calculation Spreadsheet - project 138 01Jan24 to 31Dec24 (03Dec2025) V2.xlsxOpen →other · source link
- VCS ER Calculation Spreadsheet - project 138 01Oct23 to 31Dec23 (24Feb2025) V4.xlsxOpen →other · source link
- gtrnewbedvcs-1.pdfOpen →other · source link
- gtrnewbedvcs-3.pdfOpen →other · source link
- gtrnewbedvcs-4.pdfOpen →other · source link
- VCS Verification Statement _2010-09-08.pdfOpen →other · source link
- Verification Report_2010-09-08.pdfOpen →other · source link
- VERIF_REP_01JUL2011_30JUN2012.pdfOpen →other · source link
- VERIF_REP_138_01JUL2013_31MAR2014.pdfOpen →other · source link
- VERIF_STA_01JUL2011_30JUN2012.pdfOpen →other · source link
- VERIF_STA_138_01JUL2013_31MAR2014.pdfOpen →other · source link
- 138ISS_PRR_138_25April2018.pdfOpen →other · source link
- PRR138_C1_17May2016_CLOSED.pdfOpen →other · source link
- PRR_138-Closed.pdfOpen →other · source link
- VCS_R1_PRR_0138_01 March 2024.pdfOpen →other · source link
- VCS_V8_PRR_ProjectID_138_21FEB2025-GHD Response.pdfOpen →other · source link
- CNBE VCS-Issuance-Representation-Single-Representor-v4.1 (01 JANUARY 2022 TO 30 JUNE 2022) (12 OCT 2022).pdfOpen →other · source link
- CNBE VCS-Issuance-Representation-Single-Representor-v4.1 April 1 2021-December 31 2021 (16 Mar 2022).pdfOpen →other · source link
- Issuance Representation_138_2025-12-29.pdfOpen →other · source link
- Issuance-Representation-Single-Representor -project 138 01 July 22 to 31 Dec 2022 (27 March 23).pdfOpen →other · source link
- PP_ISS_REP_01JUL2011_30JUN2012.pdfOpen →other · source link
- PP_ISS_REP_01MAY2017_31DEC2017.pdfOpen →other · source link
- PP_ISS_REP_138_01APR2014_31DEC2014.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2009_30JUN2009.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2010_30JUN2010.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2010_30JUN2010.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2011_30JUN2011.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2015_30SEP2015.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2018_31DEC2018.pdfOpen →other · source link
- PP_ISS_REP_138_01JAN2019_30SEP2019.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2009_31DEC2009.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2010_31DEC2010.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2011_30JUN2012.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2012_30JUN2013.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2012_30JUN2013.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2012_30JUN2013.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2013_31MAR2014.pdfOpen →other · source link
- PP_ISS_REP_138_01JUL2016_30APR2017.pdfOpen →other · source link
- PP_ISS_REP_138_01OCT2015_28MAR2016.pdfOpen →other · source link
- PP_ISS_REP_138_29MAR2016_30JUN2016.pdfOpen →other · source link
- VCS Issuance Deed of Representation-Single-PP- VCS Project 138 - Greater New Bedford LFG Utilization Project (1 Jan - 30 Sep 2023) (14 Feb 23).pdfOpen →other · source link
- VCS Issuance-Representation-Single-PP, Project ID 138, Greater New Bedford LFG Utilization Project (1 Oct 2023 to 31 Dec 202Open →other · source link
- VCS_Issuance_Representation,_Single_Representor,_v3.4_11_October_2016_for_29_Mar_2016_to_30_June_2016.pdfOpen →other · source link
- VCS_Issuance_Representation,_Single_Representor,_v3.4_19_September_2016_for_1_Oct_2015_to_28_Mar_2016.pdfOpen →other · source link
- VCS_Issuance_Representation,_Single_Representor,_v3.4_for_01_JANUARY_2018_to_31_DEC_2018.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1 (CommonWealth New Bedford Energy, LLC 05 May 21).pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- VCS Verification Deed of Representation, Project ID 138, Greater New Bedford LFG Utilization Project (1Oct 2023 - 31 Dec 2023) (corrected 23-Jan-25).pdf.pdfOpen →other · source link
- VCU-Issuance-Representation-Single-Representor-v4.0 Greater New Bedford LFG Utilization Project (25 August 2020).pdfOpen →other · source link
- CNBE VCS-Monitoring-Report-v2 April 1 2021 - December 31 2021 (22Feb2022).pdfDownload →monitoring · hosted copy · 7,825 KB
- CNBE VCS-Monitoring-Report-v2 July 1, 2020 - March 31, 2021 (01April2021).pdfDownload →monitoring · hosted copy · 8,602 KB
- CNBE VCS-Monitoring-Report-v4 01-Oct-2019 - 30-June-2020 V3 07AUG2020.pdfDownload →monitoring · hosted copy · 1,090 KB
- CNBE VCS-Monitoring-Report-v4.1( 01Jan2022 - 30June 2022) (18July2022).pdfDownload →monitoring · hosted copy · 20,858 KB
- CNBE VCS-Monitoring-Report-v4.1 Period July 1- December 31, 2022 Verion 3Clean -08September2023 .pdfDownload →monitoring · hosted copy · 6,780 KB
- CNBE VCS-Monitoring-Report-v4.2 Period Jan 1- Sept 30 2023 (11March2024) V2 Nmb.pdfDownload →monitoring · hosted copy · 7,630 KB
- Monitoring Report Greater New Bedford LFG 2010 -01.pdfDownload →monitoring · hosted copy · 319 KB
- MONIT_REP_01JUL2011_30JUN2012.pdfDownload →monitoring · hosted copy · 1,708 KB
- MONIT_REP_01MAY2017_31DEC2017.pdfDownload →monitoring · hosted copy · 2,562 KB
- MONIT_REP_138_01APR2014_31DEC2014.pdfDownload →monitoring · hosted copy · 368 KB
- MONIT_REP_138_01JAN2009_30JUN2009.pdfDownload →monitoring · hosted copy · 957 KB
- MONIT_REP_138_01JAN2010_30JUN2010.pdfDownload →monitoring · hosted copy · 284 KB
- MONIT_REP_138_01JAN2011_30JUN2011.pdfDownload →monitoring · hosted copy · 874 KB
- MONIT_REP_138_01JAN2014_31MAR2014.pdfDownload →monitoring · hosted copy · 241 KB
- MONIT_REP_138_01JAN2015_30SEP2015.pdfDownload →monitoring · hosted copy · 4,395 KB
- MONIT_REP_138_01JAN2018_31DEC2018.pdfDownload →monitoring · hosted copy · 2,310 KB
- MONIT_REP_138_01JAN2019_30SEP2019.pdfDownload →monitoring · hosted copy · 2,035 KB
- MONIT_REP_138_01JUL2009_31DEC2009.pdfDownload →monitoring · hosted copy · 639 KB
- MONIT_REP_138_01JUL2010_31DEC2010.pdfDownload →monitoring · hosted copy · 1,048 KB
- MONIT_REP_138_01JUL2011_30JUN2012.pdfDownload →monitoring · hosted copy · 1,708 KB
- MONIT_REP_138_01JUL2012_30JUN2013.pdfDownload →monitoring · hosted copy · 484 KB
- MONIT_REP_138_01JUL2012_30JUN2013.pdfDownload →monitoring · hosted copy · 484 KB
- MONIT_REP_138_01JUL2012_30JUN2013.pdfDownload →monitoring · hosted copy · 484 KB
- MONIT_REP_138_01JUL2013_31DEC2013.pdfDownload →monitoring · hosted copy · 326 KB
- MONIT_REP_138_01JUL2016_30APR2017.pdfDownload →monitoring · hosted copy · 2,173 KB
- MONIT_REP_138_01OCT2015_28MAR2016.pdfDownload →monitoring · hosted copy · 1,126 KB
- MONIT_REP_138_29MAR2016_30JUN2016.pdfDownload →monitoring · hosted copy · 901 KB
- VCS_Monitoring_Report_01Oct15-28Mar16_V4_08Sept2016.pdfDownload →monitoring · hosted copy · 1,126 KB
- VCS_Monitoring_Report_V2_29Mar16-30June2016_23Sept16.pdfDownload →monitoring · hosted copy · 901 KB
- VCS MR Project ID 138 Version 4 01JAN2024-31DEC2024.docx (16Jan2026).pdfDownload →monitoring · hosted copy · 10,115 KB
- VCS MR Project ID 138 Version 4 01OCT2023-31DEC2023.docx (24Feb2025).pdfDownload →monitoring · hosted copy · 10,636 KB
- PROJ_DESC_138_01DEC2005.pdfDownload →pdd · hosted copy · 1,407 KB
- PROJ_DESC_138_12MAY2016.pdfDownload →pdd · hosted copy · 1,456 KB
- PP_REG_REP_138_03FEB2016.pdfOpen →other · source link
- PP_REG_REP_138_09SEP2009.pdfOpen →other · source link
- PPRR_for_Grandparenting.pdfOpen →other · source link
- gtrnewbedvcs-2.pdfDownload →verification · hosted copy · 117 KB
- VALID_REP_138_16MAY2016.pdfDownload →verification · hosted copy · 1,809 KB
- VALID_REP_138_DEC2008.pdfDownload →verification · hosted copy · 117 KB
- VALID_STA_138_03FEB2016.pdfDownload →verification · hosted copy · 46 KB
- VALID_STA_138_08MAR2010.pdfDownload →verification · hosted copy · 32 KB
- 11203966-RPT-2-FINAL Verification Report.pdfDownload →verification · hosted copy · 891 KB
- 11203966-RPT-3-Final Verification Report Greater New Bedford LFG Utilization Project (5 May 21).pdfDownload →verification · hosted copy · 744 KB
- 11203966-RPT-5-Yeransian-Verification Report - Second Half 2022 - REV1.pdfDownload →verification · hosted copy · 906 KB
- 11203966-RPT-6-Yeransian-Verification Report - Version 2-January 1 2023 to September 30 2023 Monitoring Period - Verra Project 1.pdfDownload →verification · hosted copy · 915 KB
- 12649241-RPT-1-Yeransian-Verification Report-GHD Rev2.pdfDownload →verification · hosted copy · 933 KB
- CNBE Final Verification Report (1 Jan 2022 to 30 June 2022).pdfDownload →verification · hosted copy · 1,038 KB
- CNBE Verification Report April 1 2021 - December 31 2021 11203966-RPT-4-Yeransian-2021 Verification Report (002).pdfDownload →verification · hosted copy · 798 KB
- VCS VerR 138 01Jan2024-31DEC2024.pdfDownload →verification · hosted copy · 517 KB
- VERIF_REP_01MAY2017_31DEC2017.pdfDownload →verification · hosted copy · 208 KB
- VERIF_REP_138_01APR2014_31DEC2014.pdfDownload →verification · hosted copy · 164 KB
- VERIF_REP_138_01JAN2009_30JUN2009.pdfDownload →verification · hosted copy · 3,490 KB
- VERIF_REP_138_01JAN2010_30JUN2010.pdfDownload →verification · hosted copy · 127 KB
- VERIF_REP_138_01JAN2011_30JUN2011.pdfDownload →verification · hosted copy · 126 KB
- VERIF_REP_138_01JAN2015_30SEP2015.pdfDownload →verification · hosted copy · 169 KB
- VERIF_REP_138_01JAN2018_31DEC2018.pdfDownload →verification · hosted copy · 940 KB
- VERIF_REP_138_01JAN2019_3-SEP2019.pdfDownload →verification · hosted copy · 2,023 KB
- VERIF_REP_138_01JUL2009_31DEC2009.pdfDownload →verification · hosted copy · 170 KB
- VERIF_REP_138_01JUL2010_31DEC2010.pdfDownload →verification · hosted copy · 135 KB
- VERIF_REP_138_01JUL2011_30JUN2012.pdfDownload →verification · hosted copy · 124 KB
- VERIF_REP_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 377 KB
- VERIF_REP_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 377 KB
- VERIF_REP_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 377 KB
- VERIF_REP_138_01JUL2016_30APR2017.pdfDownload →verification · hosted copy · 419 KB
- VERIF_REP_138_01OCT2015_28MAR2016.pdfDownload →verification · hosted copy · 448 KB
- VERIF_REP_138_29MAR2016_30JUN2016.pdfDownload →verification · hosted copy · 468 KB
- 11203966-RPT-2-App C-Verification Deed of Representation.pdfDownload →verification · hosted copy · 175 KB
- CNBE VCS Verification Deed of Representation GHD Services (1 January 2022 to 30 June 2022).pdfDownload →verification · hosted copy · 100 KB
- CNBE VCS Verification Deed of Representation (GHD Services) April 1 2021 - December 31 2021.pdfDownload →verification · hosted copy · 1,468 KB
- Greater_New_Bedford_LFG_-_Verification_Representation_1Oct15-28Mar16.pdfDownload →verification · hosted copy · 139 KB
- Greater_New_Bedfor_LFG_-_VCS_Verification_Representation_29Mar16-30Jun16....pdfDownload →verification · hosted copy · 138 KB
- VCS Verification Deed of Representation (GHD 5 May 21).pdfDownload →verification · hosted copy · 1,556 KB
- VCS_Verification_Deed_of_Representation_-__Greater_New_Bedford_LFG_Utilization_Project_-_VCS_ID_138_(14_March_2024)[1].pdfDownload →verification · hosted copy · 4,266 KB
- Verification Deed of Representation - GHD Services- project 138 01 July 22 to 31 December 2022 (23 March 23) .pdfDownload →verification · hosted copy · 82 KB
- Verification Representation_138_2026-01-13.pdfDownload →verification · hosted copy · 78 KB
- Verification_Representation_for_Greater_New_Bedford_LFG_Utilization_Project_September_11,_2012.pdfDownload →verification · hosted copy · 28 KB
- VERIF_STA_01MAY2017_31DEC2017.pdfDownload →verification · hosted copy · 75 KB
- VERIF_STA_138_01APR2014_31DEC2014.pdfDownload →verification · hosted copy · 36 KB
- VERIF_STA_138_01JAN2010_30JUN2010.pdfDownload →verification · hosted copy · 36 KB
- VERIF_STA_138_01JAN2011_30JUN2011.pdfDownload →verification · hosted copy · 24 KB
- VERIF_STA_138_01JAN2015_30SEP2015.pdfDownload →verification · hosted copy · 35 KB
- VERIF_STA_138_01JAN2018_31DEC2018.pdfDownload →verification · hosted copy · 79 KB
- VERIF_STA_138_01JAN2019_30SEP2019.pdfDownload →verification · hosted copy · 229 KB
- VERIF_STA_138_01JUL2009_31DEC2009.pdfDownload →verification · hosted copy · 37 KB
- VERIF_STA_138_01JUL2010_31DEC2010.pdfDownload →verification · hosted copy · 34 KB
- VERIF_STA_138_01JUL2011_30JUN2012.pdfDownload →verification · hosted copy · 63 KB
- VERIF_STA_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 88 KB
- VERIF_STA_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 88 KB
- VERIF_STA_138_01JUL2012_30JUN2013.pdfDownload →verification · hosted copy · 88 KB
- VERIF_STA_138_01JUL2016_30APR2017.pdfDownload →verification · hosted copy · 130 KB
- VERIF_STA_138_01OCT2015_28MAR2016.pdfDownload →verification · hosted copy · 139 KB
- VERIF_STA_138_29MAR2016_30JUN2016.pdfDownload →verification · hosted copy · 138 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Landfill Methane →- ALANDFILL GAS EXTRACTION AND ELECTRICITY GENERATION PROJECT - ISTANBUL TURKEYTürkiye
- A*Mamak Landfill Waste Management Project TurkeyTürkiye
- AEcoparque Candeias Landfill Gas ProjectBrazil
- ASanta Marta Landfill Gas (LFG) Capture for Electricity Generation ProjectChile
- ACTL Landfill Gas ProjectBrazil
- AGS3434 Uberlândia landfills I and IIBrazil