Teesta Low Dam Project, Stage-IV
Renewable Energy · Hydropower · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- ENVIRONMENTAL IMPACT ASSESSMENT AND MANAGEMENTOpen →other · source link
- The 1200 MW Teesta III Hydroelectric Project in SikkimDownload →other · hosted copy · 810 KB
- CORSIADownload →other · hosted copy · 3,330 KB
- 1 VERRA REGISTRY USER GUIDEDownload →other · hosted copy · 1,367 KB
- 17 January 2023 VCS Standard v4.4Download →other · hosted copy · 1,093 KB
- Communication Agreement_NHPC_CCX.pdfOpen →other · source link
- Verra-Registry-Communications-Agreement-TLDP IV_NHPC_MPCON.pdfOpen →other · source link
- TLDP-IV Deed of Registration.pdfOpen →other · source link
- VCS PD_TLDP-IV.pdfDownload →pdd · hosted copy · 2,037 KB
- VCS PD_TLDP-IV.PDFDownload →pdd · hosted copy · 1,016 KB
- VCS Validation Report_TLDP_IV_clean.pdfDownload →verification · hosted copy · 469 KB
- ER Sheet_VCS1423-Teesta IV-NHPC-(1-4-21 to 30-06-22) (Ver03).xlsxOpen →other · source link
- Risk Analysis for Remote Inspections VCS 1423.pdfOpen →other · source link
- SD-Contributions-Report_1423_14FEB2016_17JUL2017.pdfOpen →other · source link
- 1ISS_PRR_1423_30May2018.pdfOpen →other · source link
- REG_PRR_1423_15Jan2016.pdfOpen →other · source link
- 1423 Issuance Representation v4.3.pdfOpen →other · source link
- Issuance_Deed_TLDP_IV_NHPC_VCS.pdfOpen →other · source link
- VCS1423_ Issuance Representation_v4_3.pdfOpen →other · source link
- MR_Ver5_1423_18092023.pdfDownload →monitoring · hosted copy · 536 KB
- VCS1423-Teesta-IV-NHPC-MR Apr-21 to June-22)(Ver03).pdfDownload →monitoring · hosted copy · 1,326 KB
- VCS MR_TLDP Stage IV_V02_31012018_Clean.pdfDownload →monitoring · hosted copy · 898 KB
- VCS PD (Final)_TLDP-IV_25.01.2016.pdfDownload →pdd · hosted copy · 919 KB
- Reg Rep_TLDP_25.01.2016.pdfOpen →other · source link
- VCS Validation Report_TLDP_IV_25.01.2016.pdfDownload →verification · hosted copy · 761 KB
- VCS Validation Representation Deed, v3.2_0.pdfDownload →verification · hosted copy · 147 KB
- FVR _verification_VCS 1423_TQC 30922 Final Report.pdfDownload →verification · hosted copy · 985 KB
- VCS-1423 FVR_120923.pdfDownload →verification · hosted copy · 1,127 KB
- VCS Verification Report_ TLDP Stage IV.pdfDownload →verification · hosted copy · 395 KB
- VCS1423-VVB-Verification-Representation-v4.2.pdfDownload →verification · hosted copy · 61 KB
- VCS Verification Representation, v3.3.pdfDownload →verification · hosted copy · 244 KB
- Verification-Representation-v4.2.pdfDownload →verification · hosted copy · 149 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia