Toros Hydroelectric Power Plant
Renewable Energy · Hydropower · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Aydem Yenilenebilir Enerji 2022 Annual Report (contains Toros HES production data, YEKDEM tariff details, VCS certification status, and asset-level financial disclosures)Download →other · hosted copy · 5,324 KB
- AyDemEkobilCommAgreement.pdfOpen →other · source link
- Verra-Registry-Communications-Agreemnet_GTE-AYDEM.pdfOpen →other · source link
- Final_ER_Calculations_1116 Toros Hydro-VAL_v04_10-09-2024.xlsxOpen →other · source link
- Final_ER Calculations_1117 Toros Hdyro-VER_v03_14-02-2024.xlsOpen →other · source link
- 1499_Exemption Request Response_Ekobil_9 October 2020.pdfOpen →other · source link
- Aydem Projects transferRequest.pdfOpen →other · source link
- retim A._. APX.pdfOpen →other · source link
- VCS_R1_PRR_1499_01JAN2022_16MAY2023.pdfOpen →other · source link
- I1_PRR_1499_02March2021.pdfOpen →other · source link
- IssuanceDeed Toros HPP.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3_Toros HEPP (1).pdfOpen →other · source link
- Toros Issuance Representation.pdfOpen →other · source link
- MR-Toros Hydroelectric Power Plant 1.04 .pdfDownload →monitoring · hosted copy · 2,697 KB
- Toros Hydroelectric Power Plant MR version 1.04. .pdfDownload →monitoring · hosted copy · 997 KB
- VCS-Monitoring-Report-Template-v4.1_TOROS_24012023_cc.pdfDownload →monitoring · hosted copy · 970 KB
- VCS MR 1499 01January2022-31May2023.pdfDownload →monitoring · hosted copy · 1,379 KB
- VCS PD_1499 17May2023- 16May2033.pdfDownload →pdd · hosted copy · 2,155 KB
- VCS PDToros, v2_01.pdfDownload →pdd · hosted copy · 3,845 KB
- Registration-Representation-Single-PP-v4.4-FINAL_Toros HEPP.pdfOpen →other · source link
- retim A._..pdfOpen →other · source link
- VCS-Registration-Representation-Single-Representor-v4.1 (VCS1499).pdfOpen →other · source link
- FVR_11DG18MD_rev 1Aa_10052015approved.pdfDownload →verification · hosted copy · 3,027 KB
- VCS CPRenValR 1499 09072024-14102024.pdfDownload →verification · hosted copy · 2,406 KB
- Signed_VCS CP Renewal Val Rep_ 1116 Toros Hydro_Christian Johannes_14-10-2024.pdfDownload →verification · hosted copy · 1,231 KB
- VCS Validation Representation, v3_2_0_Toros_signed.pdfDownload →verification · hosted copy · 143 KB
- CCIPL1100 FVR.clean.pdfDownload →verification · hosted copy · 1,311 KB
- Final Verification Report_Toros_clean.pdfDownload →verification · hosted copy · 620 KB
- Final Verification Report_Toros.pdfDownload →verification · hosted copy · 609 KB
- VCS VerR Project 1499 01012022-16052023_cc.pdfDownload →verification · hosted copy · 2,238 KB
- Signed_VCS Ver Rep_1117 Toros Hydro-VER_Christian Johannes_27-05-2024.pdfDownload →verification · hosted copy · 249 KB
- VCS-Verification-Representation-v4.1_CCIPL1100.pdfDownload →verification · hosted copy · 99 KB
- VCS-Verification-Representation-v4.1_Toros.pdfDownload →verification · hosted copy · 132 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia