Solar Power Project by Mytrah Energy India Private Limited
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Joint Project Description & Monitoring Report – 100 MW Solar Project in Bhadla in Rajasthan (ACM0002 v19, VCS Version 3 v3.1, structurally identical analogue to VCS1784 methodology)Download →pdd · hosted copy · 1,758 KB
- Verification Report – Ghani Solar Renewable Power Project by Greenko Group (VCS ID 1792, ACM0002 v18.1, monitoring period 01/01/2021–31/07/2021, Earthood Services, 23-Nov-2021)Download →verification · hosted copy · 440 KB
- VMR0017 Grid-connected electricity generation from renewable sources (ACM0002 Revision), v1.0 – Verra (methodology superseding ACM0002 from January 2027)Download →methodology · hosted copy · 151 KB
- ADB Project Completion Report – Mytrah Wind and Solar Power Development Project (confirms JSW Neo Energy acquisition of Mytrah SPVs in March 2023)Open →other · source link
- Communications-Agreement_1784.pdfOpen →other · source link
- VCS Joint PD MR_Mytrah_V01_04072018 (1).pdfDownload →pdd · hosted copy · 1,197 KB
- ER Sheet Mytrah Solar_VCS 1784.xlsxOpen →other · source link
- ER Sheet Mytrah Solar_VCS 1784.xlsxOpen →other · source link
- VCS ER 1784 010723-310324.xlsxOpen →other · source link
- SDG contributions_VCS 1784_19062017-17032019_Clean.pdfOpen →other · source link
- SDG Report_VCS 1784_18-Mar-2019 to 31-Mar-2020.pdfOpen →other · source link
- SOLAR POWER PROJECT BY MYTRAH ENERGY INDIA PRIVATE L -Clean.pdfOpen →other · source link
- V2_PRR_748_27July2022.pdfOpen →other · source link
- VCS 1784-Deed of Accession.pdfOpen →other · source link
- I2_PRR_1784_24MAY2021.pdfOpen →other · source link
- V3_1784_PRR_5Nov2021.pdfOpen →other · source link
- VCS_PRR_1784_01JULY2023-31MARCH2024.pdfOpen →other · source link
- VCS_R1_PRR_1784_18MARCH2024.pdfOpen →other · source link
- Issuance Representation_1784_2026-08-07.pdfOpen →other · source link
- Issuance Representation.pdfOpen →other · source link
- Issuance Representation-Revised.pdfOpen →other · source link
- VCS-1784-Issuance Representation. latest Template.pdfOpen →other · source link
- VCS deed of Representation 1784 (1).pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1 (2).pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1 (2).pdfOpen →other · source link
- VCS_represenatation_Single Reprsentation.pdfOpen →other · source link
- Monitoring Report Mytrah Solar_VCS 1784 - Clean.pdfDownload →monitoring · hosted copy · 615 KB
- VCS Joint PD MR_V02_08.06.2019.pdfDownload →monitoring · hosted copy · 2,509 KB
- VCS MR 1784 010424-310325_TR Closed.pdfDownload →monitoring · hosted copy · 1,466 KB
- VCS MR 1784 010723-310324_v3.0_Cleaned.pdfDownload →monitoring · hosted copy · 1,233 KB
- VCS-MR 1784- Clean.pdfDownload →monitoring · hosted copy · 822 KB
- VCS-MR 1784_Reviewed_SM_25072022 (1).docx.pdfDownload →monitoring · hosted copy · 1,392 KB
- VCS MR _final.pdfDownload →monitoring · hosted copy · 596 KB
- VCS MR _V02_1784.pdfDownload →monitoring · hosted copy · 1,469 KB
- VCS Joint PD MR_V02_08.06.2019.pdfDownload →pdd · hosted copy · 2,509 KB
- Registration Representation.pdfOpen →other · source link
- FVR-ValVer_Mytrah Energy-TQC 5618_13.06.2019_TR Resp2.pdfDownload →verification · hosted copy · 7,758 KB
- 5618_VCS Validation Representation, v3.3.pdfDownload →verification · hosted copy · 517 KB
- Verification Representation.pdfDownload →verification · hosted copy · 1,242 KB
- 1784- Verification Report_clean.pdfDownload →verification · hosted copy · 523 KB
- FVR _Mytrah-VCS 1784_TQC 16122_SM_02.08.2022.pdfDownload →verification · hosted copy · 840 KB
- FVR _Mytrah-VCS 1784_TQC 6122 - Clean.pdfDownload →verification · hosted copy · 403 KB
- FVR-ValVer_Mytrah Energy-TQC 5618_13.06.2019_TR Resp2.pdfDownload →verification · hosted copy · 7,758 KB
- VCS-FVR_VKU.VER.130.23_VCS_1784-Clean.pdfDownload →verification · hosted copy · 1,163 KB
- VCS-Verification-Report-1784_final_rl.pdfDownload →verification · hosted copy · 129 KB
- VCS VerR 1784 01APR2024-31MAR2025_TR Closed.pdfDownload →verification · hosted copy · 1,860 KB
- VCS VerR VCS 1784 01-July-2023 to 31-March-2024_v3.0_Cleaned.pdfDownload →verification · hosted copy · 863 KB
- 5618_VCS Verification Representation, v3.3.pdfDownload →verification · hosted copy · 528 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 127 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 23 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 43 KB
- Verification Representation_1784_2026-05-08.pdfDownload →verification · hosted copy · 106 KB
- Verification-Representation-v4.2.pdfDownload →verification · hosted copy · 247 KB
- Verification-Representation-v4.2_VKU.VER.130.23_VCS_1784_signed.pdfDownload →verification · hosted copy · 134 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia