Santa Teresa Hydropower Plant
Renewable Energy · Hydropower · Peru
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM Project Validation Page — Santa Teresa Hydropower Plant (ACM0002 v.12, TUEV-RHEIN)Download →other · hosted copy · 1 KB
- PDD_SantaTeresa HPP v3.7 (25 March 2016) — hosted on CDM UNFCCC (2099 KB PDF; access blocked during review)Download →pdd · hosted copy · 1 KB
- PDD_SantaTeresa HPP v3.7 (archived GEM Wiki reference)Download →pdd · hosted copy · 1 KB
- PRR, Project ID 1841, 14 April 2022.pdfOpen →other · source link
- ISSUANCE REPRESENTATION PL1841 09JUL2019.pdfOpen →other · source link
- PP_LIST_REP_PL1841_03DEC2018.pdfOpen →other · source link
- MONITORING REPORT PL1841 21JUN2019.pdfDownload →monitoring · hosted copy · 1,222 KB
- JOINT_PROJ_DESC_MONIT_REP_PL1841_24SEP2018.pdfDownload →pdd · hosted copy · 1,357 KB
- PROJ_DESC_1841_21JUN2019.pdfDownload →pdd · hosted copy · 1,255 KB
- PP_REG_REP_1841_09JUL2019.pdfOpen →other · source link
- VALID_REP_1841_03JUL2019.pdfDownload →verification · hosted copy · 493 KB
- VERIF_STA_1841_01SEP2015_31DEC2017.pdfDownload →verification · hosted copy · 90 KB
- VCS-Joint-Validation-Verification-Report_Santa Teresa_26042022_V3.pdfDownload →verification · hosted copy · 561 KB
- AENOR VERIFICATION REPRESENTATION PL1841 03JUL2019.pdfDownload →verification · hosted copy · 90 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia