100 MW SOLAR PROJECT IN BHADLA IN RAJASTHAN.
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Joint Project Description & Monitoring Report (JPD-MR) — 100 MW Solar Project in Bhadla in Rajasthan, VCS Version 3, Version 02, dated 19-Aug-2019, Monitoring Period 16-Sep-2018 to 31-Oct-2018Download →pdd · hosted copy · 1,758 KB
- Monitoring Report — 100 MW Solar Project in Bhadla in Rajasthan, VCS Version 4.0, Report ID 1842-II, Version 02, dated 25-Jun-2020, Monitoring Period 01-Nov-2018 to 31-Mar-2020Download →monitoring · hosted copy · 917 KB
- Communication Agreement_P5.pdfOpen →other · source link
- VCS-1842 01sept2021-31Mar2023 ER Sheet v05_TR Closure_Revised.xlsxOpen →other · source link
- 210305_Verra_SDG_Contributions_Report_1842.docx.pdfOpen →other · source link
- SDG-Contributions-Report (VCS 1842)-20220827 (clean final).pdfOpen →other · source link
- R_PRR_1842 _6JUL2022.docxOpen →other · source link
- VCS-Issuance-Representation-SinglePP-v3.5-100MW.pdfOpen →other · source link
- VCS-Issuance-Representation-v4.1 (signed WeAct).pdfOpen →other · source link
- VCS-Issuance-Representation-v4.1 (VCS1842)-signed.pdfOpen →other · source link
- vcs-issuance-representation-VCS 1842..pdfOpen →other · source link
- VCS-Issuance-Rep-v4.1 (signed)_VCS1842.pdfOpen →other · source link
- MON_REP_1842_01OCT2020_31AUG2021.pdfDownload →monitoring · hosted copy · 514 KB
- MR (VCS1842-VerII)-V2-100MW Raj (final).pdfDownload →monitoring · hosted copy · 917 KB
- VCS(Joint)_PD+MR_Ver02_Final.pdfDownload →monitoring · hosted copy · 1,758 KB
- VCS MR 1842 01SEP2021-31MAR2023_round 01_clean.pdfDownload →monitoring · hosted copy · 1,664 KB
- VCS MR-1842-(Apr2020-Sep2020)-17Nov2020.pdfDownload →monitoring · hosted copy · 903 KB
- VCS_Joint(PD+MR)_Ver01_Project5.pdfDownload →pdd · hosted copy · 735 KB
- VCS(Joint)_PD+MR_Ver02_Final.pdfDownload →pdd · hosted copy · 1,758 KB
- VCS-Registration-Representation-SinglePP-v3.4-100MW.pdfOpen →other · source link
- VCS.VAL.18.25-Joint-VCR (100 MW Bhadla)_signed.pdfDownload →verification · hosted copy · 677 KB
- Validation deed.pdfDownload →verification · hosted copy · 252 KB
- GCEES_2220_VER_Solar_Bhadla_100 MW (final).pdfDownload →verification · hosted copy · 630 KB
- VCS.20 ver.021-Verification Report-approved.pdfDownload →verification · hosted copy · 513 KB
- VCS.VAL.18.25-Joint-VCR (100 MW Bhadla)_signed.pdfDownload →verification · hosted copy · 677 KB
- VCS VerR 1842 01SEP2021-31MAR2023_round 01_clean.pdfDownload →verification · hosted copy · 1,463 KB
- VER_REP_1842_01OCT2020_31AUG2021.pdfDownload →verification · hosted copy · 341 KB
- vcs-verification-representation-v4.1.pdfDownload →verification · hosted copy · 132 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 127 KB
- VCS-Verification-Representation-v4.1 (VCS1842).pdfDownload →verification · hosted copy · 1,258 KB
- Verification deed.pdfDownload →verification · hosted copy · 265 KB
- Verification-Representation-v4.2_VKU.VER.199.24_VCS_1842_revised.pdfDownload →verification · hosted copy · 3,142 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia