150 MW Solar Project in Karnataka by Avaada Solar
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Karnataka Pavagada-II Solar Project by Avaada (150 MW) — Project Description v02.1, 21 December 2019 (VCS Version 3 v3.3)Download →pdd · hosted copy · 2,301 KB
- COMMUNICATIONS AGREEMENT_150MW_signed.pdfOpen →other · source link
- VCS 1914 ER 01SEPT2021-31MAR2023.xlsxOpen →other · source link
- 210319_Verra_SDG_Contributions_Report_1914.pdfOpen →other · source link
- V3_1914_PRR_18MAY2022.pdfOpen →other · source link
- RI_PRR_1914_30MAR2020.pdfOpen →other · source link
- VCS_V4_PRR_1914_01SEPT2021_31MAR2023.pdfOpen →other · source link
- VCS-Issuance-Representation-v4.1 (signed).pdfOpen →other · source link
- VCS-Issuance-Representation-v4.1 (VCS1914)-signed.pdfOpen →other · source link
- vcs-issuance-representation-VCS 1914.pdfOpen →other · source link
- VCS-Listing-Representation-v3.3_150MW_signed.pdfOpen →other · source link
- MR-VCS1914 (Ver-II)_ver02_01Aug2020_clean.pdfDownload →monitoring · hosted copy · 545 KB
- VCS-1914_MR-final_version 03.1 (09April2022)_cleantrack.pdfDownload →monitoring · hosted copy · 791 KB
- VCS(Joint)_PD+MR_Ver03_150MW_Karnataka_25Nov2019_Cleantrack.pdfDownload →monitoring · hosted copy · 2,725 KB
- VCS MR 1914 01SEP2021-31MAR2023_clean.pdfDownload →monitoring · hosted copy · 939 KB
- VCS(Joint)_PD+MR_Ver03_150MW_Karnataka_25Nov2019_Cleantrack.pdfDownload →pdd · hosted copy · 2,725 KB
- Final Validation and Verification Report.pdfDownload →verification · hosted copy · 598 KB
- Final Validation and Verification Report.pdfDownload →verification · hosted copy · 598 KB
- FVR _VCS_VER_3721_VCS ID 1914_18.02.2022 - Clean.pdfDownload →verification · hosted copy · 344 KB
- GCEES_2420_Verification Report_VCS VER_Avaada 150 MW_14.08.2020.pdfDownload →verification · hosted copy · 380 KB
- VCS VerR 1914 01SEP2021-31MAR2023_clean.pdfDownload →verification · hosted copy · 1,581 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 1,246 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 126 KB
- Verification-Representation-v4.2_VKU.VER.197.24_VCS_1914.pdfDownload →verification · hosted copy · 185 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia