Karnataka Pavagada-II Solar Project by Avaada (150 MW)
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Karnataka Pavagada-II Solar Project by Avaada (150 MW) – Project Description VCS Version 3 v3.3, Version 02.1, 21 December 2019Download →pdd · hosted copy · 2,301 KB
- COMMUNICATIONS AGREEMENT_150MW KA_signed.pdfOpen →other · source link
- VCS 2017_ER MR_v0_For 4.3_Clean.xlsxOpen →other · source link
- 2017, Karnataka Pavagada-II, India PRR [3].docxOpen →other · source link
- Final_SDG-Contributions-Report (VCS 2017)-evi20220825 - Clean.pdfOpen →other · source link
- R_PRR_2017_27JUN2022.docxOpen →other · source link
- VCS-Issuance-Representation-v4.1 (signed)-VCS2017.pdfOpen →other · source link
- VCS-Issuance-Representation-v4.1 (VCS2017).pdfOpen →other · source link
- vcs-issuance-representation-VCS 2017.pdfOpen →other · source link
- VCS-Listing-Representation_v4_150MW_signed.pdfOpen →other · source link
- MON_REP_2017_01NOV2020_31AUG2021.pdfDownload →monitoring · hosted copy · 870 KB
- VCS(2017)_MR_v2.0 (23Feb 2021)_approved.pdfDownload →monitoring · hosted copy · 518 KB
- VCS MR 2017 01092021 - 31032023_Round 04_Clean.pdfDownload →monitoring · hosted copy · 446 KB
- PROJ_DESC_2017_21DEC2019.pdfDownload →pdd · hosted copy · 2,301 KB
- VCS-PD(v3.3)_150MW KA (after VERRA review).pdfDownload →pdd · hosted copy · 1,497 KB
- VALID_REP_2017_23DEC2019.pdfDownload →verification · hosted copy · 455 KB
- FVR_VCS_VER_3921_VCS ID 2017 _05.02.2022.pdfDownload →verification · hosted copy · 576 KB
- FVR_VCS VER_Avaada 150 MW (2017)_24.02.2021.pdfDownload →verification · hosted copy · 357 KB
- VCS VerR 2017 01092021 - 31032023_Round 02_Clean.pdfDownload →verification · hosted copy · 803 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 1,259 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 127 KB
- Verification-Representation-v4.2_VKU.VER.196.24_VCS_2017.pdfDownload →verification · hosted copy · 168 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia