Allain Duhangan Hydroelectric Project (ADHP)
Renewable Energy · Hydropower · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Allain Duhangan Hydroelectric Project (ADHP) — Project Design Document (CDM, validated by DNV-CUK, registered 17 May 2007)Download →pdd · hosted copy · 1 KB
- PDD Appendix 1 — CalculationsDownload →other · hosted copy · 1 KB
- PDD Appendix 2 — IRR CalculationsDownload →other · hosted copy · 1 KB
- CDM Validation Report (DNV-CUK, 1169 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report — Period 01 Jun 2010 – 31 May 2011 (169,798 CERs issued)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 01 Jan 2014 – 31 Dec 2014 (494,016 CERs issued, VVS 7.0)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 01 Jan 2016 – 30 Sep 2016 (449,246 CERs issued)Download →monitoring · hosted copy · 1 KB
- CDM Project Registry Page — Project 0862 (full issuance history, accessed 25 Sep 2026)Download →other · hosted copy · 1 KB
- World Bank Kyoto Funds — India: Allain Duhangan Hydroelectric ProjectOpen →other · source link
- IFC/CAO Ombudsman — India: AD Hydro Power Limited-01/Himachal Pradesh (complaint record)Download →other · hosted copy · 144 KB
- AD Hydro (1).pdfOpen →other · source link
- VCS-Listing-Representation.pdfOpen →other · source link
- 24032020 AD Hydro_VCS MR V3.pdfDownload →monitoring · hosted copy · 428 KB
- VCS PD_AD Hydro_V03_Clean.pdfDownload →pdd · hosted copy · 482 KB
- FVR-VCS GAP ValVer-ADHP_TQC 0920_Clean.pdfDownload →verification · hosted copy · 454 KB
- FVR-VCS GAP ValVer-ADHP_TQC 0920_Clean.pdfDownload →verification · hosted copy · 454 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia