Greenfield Solar Power Mission by Fortum India
Renewable Energy · Solar - Centralized · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Joint Project Description & Monitoring Report: 100 MW Solar Project in Bhadla in Rajasthan — VCS Version 3, v3.1 (Version 02, dated 19 Aug 2019)Download →pdd · hosted copy · 1,758 KB
- CDM Project 10404: Solar Power Project by Fortum FinnSurya Energy Pvt Ltd (ACM0002 v17, Pavagada 100 MW) — UNFCCC CDM Registry page with PDD and public commentsDownload →other · hosted copy · 1 KB
- CDM Project 10403: 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd — UNFCCC CDM Registry page with PDD and public additionality challengesDownload →other · hosted copy · 1 KB
- Communication.pdfOpen →other · source link
- VCS ER Sheet_2069_01JAN2024-30JUN2024_v2.xlsxOpen →other · source link
- VCS ER Sheet_2069_01July2024 - 31july 2025_v2.xlsxOpen →other · source link
- Accession registration representation 2069.pdfOpen →other · source link
- Partial Release Registration Representation_2069 JB.pdfOpen →other · source link
- PRR ID 2069_PRR-01Jan2024 to 30 Jun 2024_approved.pdfOpen →other · source link
- PRR ID 2069_PRR_Jan2023.pdfOpen →other · source link
- PD_20191115 (1) _Clean copy.pdfDownload →pdd · hosted copy · 1,021 KB
- 0074_001.pdfOpen →other · source link
- 2752_001.pdfOpen →other · source link
- Issuance Deed.pdfOpen →other · source link
- Issuance Representation_2069_2026-03-31.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3_VCS2069.pdfOpen →other · source link
- VCS Listing Representation.pdfOpen →other · source link
- VCS_2069_MR_v04.pdfDownload →monitoring · hosted copy · 1,010 KB
- VCS 2069-MR-v3_Clean_01_04_2026.pdfDownload →monitoring · hosted copy · 1,562 KB
- VCS_MR_2069_01April2023-31December2023.pdfDownload →monitoring · hosted copy · 2,481 KB
- VCS MR_2069_01JAN2024-30JUN2024_round1_ Clean_v2.2.pdfDownload →monitoring · hosted copy · 954 KB
- VCS-MR-Fortum 250MW-v07_Clean.pdfDownload →monitoring · hosted copy · 768 KB
- VCS PD V4_Fortum_250 MW -Clean.pdfDownload →pdd · hosted copy · 1,241 KB
- VCS-Validation-Report-Template-v4.0.pdfDownload →verification · hosted copy · 1,119 KB
- FVR_2025_GQ_CE_1070_VCS-2069_01_04_2026_Rev1.3Aa.pdfDownload →verification · hosted copy · 1,041 KB
- FVR_VCS 2069_TQC 10622_v05 - Clean.pdfDownload →verification · hosted copy · 441 KB
- VCS-Verification Report_VKU.VER.104.23_VCS_2069.pdfDownload →verification · hosted copy · 1,388 KB
- VCS VerR_2069_01April23- 31December23.pdfDownload →verification · hosted copy · 2,578 KB
- VCS VerR_2069_01JAN2024-30JUN2024_round1_Clean_v03.pdfDownload →verification · hosted copy · 1,864 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 141 KB
- VCS-Verification-Representation-v4.1_VKU.VER.104.23_VCS_2069_signed.pdfDownload →verification · hosted copy · 825 KB
- Verification Representation (1).pdfDownload →verification · hosted copy · 100 KB
- Verification-Representation-v4.2_VKU.VER.195.24_VCS_2069.pdfDownload →verification · hosted copy · 134 KB
- Verification-Representation-v4.2_VKU.VER.208.24_VCS_2069.pdfDownload →verification · hosted copy · 163 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Solar - Centralized →- BBBRenewable Solar Power Project by ReNew Solar Power Private LimitedIndia
- BBBSolar Energy Project(s) by SB Energy Private LimitedIndia
- BBBBundled Solar Photovoltaic Project by ACMEIndia
- BBBGhani Solar Renewable Power Project by Greenko GroupIndia
- BBBRenewable Solar Power Project by Adani Green Energy LimitedIndia
- BBBEnergising India using Solar Energy ProjectsIndia