Hunan Dongping 72MW Hydropower Project
Renewable Energy · Hydropower · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- TÜV SÜD Validation Report No. 914109 — Validation of the CDM Project: Hunan Dongping 72MW Hydropower Project (14 January 2008, with 35-page Validation Protocol and Information Reference List)Download →verification · hosted copy · 1 KB
- Project Design Document (PDD) v.5 — Hunan Dongping 72MW Hydropower Project (Final version, 10 August 2007, 482 KB)Download →pdd · hosted copy · 1 KB
- Project Design Document (PDD) — Crediting Period 2 Renewal (v.15 methodology, March 2015, 538 KB)Open →pdd · source link
- Monitoring Report — Period 1: 12 Feb 2008 – 30 Sep 2008 (59 KB, 131,297 CERs issued)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 3: 01 Aug 2009 – 31 Aug 2010 (146 KB, 207,044 CERs issued)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 5: 01 Sep 2011 – 30 Jun 2012 (163 KB, 172,646 CERs issued)Download →monitoring · hosted copy · 1 KB
- CDM Project Registry Page — Hunan Dongping 72MW Hydropower Project (CDM #1311), Crediting Period 1 (12 Feb 2008 – 11 Feb 2015)Download →other · hosted copy · 1 KB
- CDM Project Registry Page — Hunan Dongping 72MW Hydropower Project (CDM #1311), Crediting Period 2 Renewal (12 Feb 2015 – 11 Feb 2022)Download →other · hosted copy · 1 KB
- ACM0002 ver. 6 — Consolidated methodology for grid-connected electricity generation from renewable sources (applied at CDM registration, 2008)Download →methodology · hosted copy · 1 KB
- VCS30-Dongping_Communication Agreement.pdfOpen →other · source link
- VCS30-Dongping_Letter of Agreement for Project Transfer Request.pdfOpen →other · source link
- PRR_30_1oct2012to 31mar2017.pdfOpen →other · source link
- 02-VCS30-Dongping_VCS Issuance representation.pdfOpen →other · source link
- VCS30-Dongping_VCS Listing Representation.pdfOpen →other · source link
- Monitoring-Report-v4.0-VCS30- clean.pdfDownload →monitoring · hosted copy · 1,479 KB
- VCS-Verification-Report-Hunan Dongping 72MW Hydropower Project_CTI-clean.pdfDownload →verification · hosted copy · 377 KB
- 04-VCS30-Dongping_VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 105 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia