Gansu Huanghe Bingling Hydropower Station Project
Renewable Energy · Hydropower · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gansu Huanghe Bingling Hydropower Station Project – Project Design Document (accepted 15 Apr 2010, 1041 KB)Download →pdd · hosted copy · 1 KB
- PDD Appendix 2 – Track Change Version V3.0 (091104)Download →pdd · hosted copy · 1 KB
- TÜV SÜD Validation Report (723 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report – Period 1: 12 Feb 2009 – 30 Jun 2009 (89 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 2: 01 Jul 2009 – 28 Jun 2010 (101 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 5: 28 Feb 2012 – 29 Jul 2012 (185 KB) [with SGS UK verification, 348,651 CERs issued]Download →monitoring · hosted copy · 1 KB
- ACM0002 Version 10 – Consolidated methodology for grid-connected electricity generation from renewable sourcesDownload →methodology · hosted copy · 358 KB
- CDM Project Registry Page – CDM 1985 / VCS453 (Gansu Huanghe Bingling Hydropower Station Project)Download →other · hosted copy · 1 KB
- VCS ER Sheet 453 01Jan2016-03Aug2018-20250303.xlsxOpen →other · source link
- VCS_CP1_V4_PRR_ProjectID_0453_14032025.pdfOpen →other · source link
- PP_ISS_REP_453_01JAN2013_31DEC2015.pdfOpen →other · source link
- PP_ISS_REP_453_01JAN2016_03AUG2018.pdfOpen →other · source link
- PP_ISS_REP_453_04AUG2008_11FEB2009.pdfOpen →other · source link
- MONIT_REP_453_01JAN2013_31DEC2015.pdfDownload →monitoring · hosted copy · 1,781 KB
- MONIT_REP_453_04AUG2008_11FEB2009.pdfDownload →monitoring · hosted copy · 453 KB
- VCS MR 453 01Jan2016-03Aug2018-20241112-clean.pdfDownload →monitoring · hosted copy · 1,128 KB
- VCS_VerR_453_01Jan2016 to 03Aug2018-V3.1-clean.pdfDownload →verification · hosted copy · 906 KB
- VERIF_REP_453_01JAN2013_31DEC2015.pdfDownload →verification · hosted copy · 623 KB
- VERIF_REP_453_04AUG2008_11FEB2009.pdfDownload →verification · hosted copy · 476 KB
- VERIF_STA_453_01JAN2013_31DEC2015.pdfDownload →verification · hosted copy · 106 KB
- VERIF_STA_453_01JAN2016_03AUG2018.pdfDownload →verification · hosted copy · 176 KB
- VERIF_STA_453_04AUG2008_11FEB2009.pdfDownload →verification · hosted copy · 46 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia