50 MW Sipansihaporas Hydro Power Plant, North Sumatra
Renewable Energy · Hydropower · Indonesia
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- South Pole Project Brief — Sipansihaporas Hydropower Indonesia (Project 300356, April 2020)Download →other · hosted copy · 720 KB
- CSIS Commentaries CSISCOM00423: Indonesian Carbon Market — Hope or Hype? (November 2023, references PLN Sipansihaporas credits)Download →other · hosted copy · 220 KB
- Carbonmark VCS-486 Registry Listing PageDownload →other · hosted copy · 125 KB
- COMMS_AGR_486_23JUL2010.pdfOpen →other · source link
- 130807_SCR_Sipansihaporas_Year_0_imp_ls_ver.2.pdfOpen →other · source link
- 2nd_verification_PPIR_VCS_Issuance_Representation_Sipansihaporas_v3.2.pdfOpen →other · source link
- 300356-1.pdfOpen →other · source link
- 300356-3.pdfOpen →other · source link
- 300356-4.pdfOpen →other · source link
- FINAL_REPORT_1st_Validation_30_-_01102013_Ver_2.0_(02122013).pdfOpen →other · source link
- SC_REP_POINT_ZERO_01OCT2013.pdfOpen →other · source link
- SC_TERMS_CONDITIONS_06DEC2013.pdfOpen →other · source link
- SC_VALID_REP_486_01NOV2013.pdfOpen →other · source link
- VCS_Verification_Representation,_Single_Representor_50MW.pdfOpen →other · source link
- V5_486_PRR_16Sept2022.docxOpen →other · source link
- 120922_Sipansihaporas_VCS Issuance Deed (SIGNED).pdfOpen →other · source link
- PP_ISS_REP_486_01APR2009_31MAR2010.pdfOpen →other · source link
- PP_ISS_REP_486_01APR2010_28FEB2013.pdfOpen →other · source link
- PP_ISS_REP_486_01APR2016_30APR2017.pdfOpen →other · source link
- PP_ISS_REP_486_01MAR2013_31MAR2016.pdfOpen →other · source link
- 20220624_Sipansihaporas_Monitoring Report_MP02_01052017to31122020_v4_Clean.pdfDownload →monitoring · hosted copy · 862 KB
- MONIT_REP_486_01APR2009_31MAR2010.pdfDownload →monitoring · hosted copy · 5,114 KB
- MONIT_REP_486_01APR2010_28FEB2013.pdfDownload →monitoring · hosted copy · 3,322 KB
- MONIT_REP_486_01APR2016_30APR2017.pdfDownload →monitoring · hosted copy · 1,587 KB
- MONIT_REP_486_01MAR2013_31MAR2016.pdfDownload →monitoring · hosted copy · 1,662 KB
- VCS_Sipansihaporas_HEPP_MR_(Apr'10-Feb'13)_rev2_ls_2.pdfDownload →monitoring · hosted copy · 3,322 KB
- PROJ_DESC_486_10NOV2009.pdfDownload →pdd · hosted copy · 1,624 KB
- PROJ_DESC_486_30OCT2017.pdfDownload →pdd · hosted copy · 3,935 KB
- 300356-2.pdfDownload →verification · hosted copy · 509 KB
- VALID_REP_486_18NOV2009.pdfDownload →verification · hosted copy · 601 KB
- VALID_REP_486_31OCT2017.pdfDownload →verification · hosted copy · 552 KB
- VALID_STA_486_18NOV2009.pdfDownload →verification · hosted copy · 22 KB
- VALID_STA_486_1NOV2017.pdfDownload →verification · hosted copy · 71 KB
- 21-072 Sipansihaporas HPP VCS ID 486 CPII MP2 FVR 2022-06-29_Clean.pdfDownload →verification · hosted copy · 1,189 KB
- VERIF_REP_486_01APR2016_30APR2017.pdfDownload →verification · hosted copy · 542 KB
- VERIF_REP_486_01MAR2013_31MAR2016.pdfDownload →verification · hosted copy · 566 KB
- VERI_REP_486_01APR2010_28FEB2013.PDFDownload →verification · hosted copy · 882 KB
- VERI_REP_486_01APR2010_28FEB2013.PDFDownload →verification · hosted copy · 882 KB
- VCS-Verification-Representation-v4.1 (11).pdfDownload →verification · hosted copy · 351 KB
- VERIF_STA_486_01APR2009_31MAR2010.pdfDownload →verification · hosted copy · 18 KB
- VERIF_STA_486_01APR2010_28FEB2013.pdfDownload →verification · hosted copy · 13 KB
- VERIF_STA_486_01APR2016_30APR2017.pdfDownload →verification · hosted copy · 131 KB
- VERIF_STA_486_01MAR2013_31MAR2016.pdfDownload →verification · hosted copy · 131 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia