Zhumadian Zhongyuan Gas-Steam Combined Cycle Power Project in Henan China
Industrial & Commercial · Natural Gas Electricity Generation · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM PDD – Zhumadian Zhongyuan Gas-Steam Combined Cycle Power Project in Henan China (ver. 03, 694 KB)Download →pdd · hosted copy · 0 KB
- CDM PDD – Pre-review version (data before EB corrections, 915 KB)Download →pdd · hosted copy · 0 KB
- TÜV SÜD Validation Report (473 KB)Download →verification · hosted copy · 0 KB
- Monitoring Report – Period 1: 25 Aug 2009 – 28 Feb 2010 (205 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report – Period 2: 01 Mar 2010 – 30 Jun 2010 (263 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report – Period 6: 01 Dec 2011 – 30 Jun 2013 (763 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report – Period 7: 01 Jul 2013 – 31 Dec 2014 (599 KB) [issuance pending]Download →monitoring · hosted copy · 0 KB
- CDM Project Page – CDM #2344 (full registry record, read successfully)Download →other · hosted copy · 0 KB
- AM0029 ver. 3 – Baseline Methodology for Grid Connected Electricity Generation Plants using Natural GasDownload →methodology · hosted copy · 0 KB
- PP_ISS_REP_530_25AUG2007_24AUG2009.pdfOpen →other · source link
- MONIT_REP_530_25AUG2007_24AUG2009.pdfDownload →monitoring · hosted copy · 194 KB
- PROJ_DESC_530_14AUG2009.pdfDownload →pdd · hosted copy · 694 KB
- PP_REG_REP_530_04NOV2010.pdfOpen →other · source link
- VALID_REP_530_03NOV2010.pdfDownload →verification · hosted copy · 242 KB
- VALID_REP_530_24AUG2009.pdfDownload →verification · hosted copy · 474 KB
- VALID_STA_530_15NOV2010.pdfDownload →verification · hosted copy · 156 KB
- VERIF_REP_530_25AUG2007_24AUG2009.pdfDownload →verification · hosted copy · 242 KB
- VERIF_STA_530_25AUG2007_24AUG2009.pdfDownload →verification · hosted copy · 17 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Natural Gas Electricity Generation →- BBBZhangjiagang Nature Gas Power Generation ProjectChina
- BBBNatural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power LimitedIndia
- BBBNanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant ProjectChina
- BBBChina Guangdong Shenzhen Qianwan LNG generation projectChina
- BBBGuangdong Huizhou LNG Power Generation ProjectChina
- BBBGrid connected electricity generation plant using natural gas at Jurong Island in SingaporeSingapore