Guizhou Qingshuihe Gelibridge Hydropower Project
Renewable Energy · Hydropower · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Guizhou Qingshuihe Gelibridge Hydropower Project — CDM Project Design Document (accepted 07 Apr 2011, 394 KB)Download →pdd · hosted copy · 0 KB
- Geli Bridge Hydropower Project — Original/Draft PDD (pre-registration, 351 KB, from public validation page)Download →pdd · hosted copy · 0 KB
- Appendix 1 — Geliqiao IRR Calculation Sheet (Excel, 439 KB)Download →other · hosted copy · 0 KB
- CDM Validation Report by TÜV SÜD South Asia (637 KB)Download →verification · hosted copy · 0 KB
- Monitoring Report — Period 1: 04 Oct 2010–31 Oct 2010 (134 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report — Period 2: 01 Nov 2010–31 Aug 2011 (147 KB)Download →monitoring · hosted copy · 0 KB
- Monitoring Report — Period 3: 01 Sep 2011–31 Aug 2012 (401 KB)Download →monitoring · hosted copy · 0 KB
- VCS Project Description (Scribd copy — GelibridgeVCS-Project-Description-Final-Clean)Download →other · hosted copy · 1,164 KB
- PROJ_DESC_###_25FEB2011.pdfOpen →other · source link
- PROJ_DESC_###_25NOV2010.pdfOpen →other · source link
- VALID_STA_###_20MAY2011.pdfOpen →other · source link
- Project ID 0656_PRR_28-06-2022_dl.docxOpen →other · source link
- PP_ISS_REP_656_06FEB2010_03OCT2010.pdfOpen →other · source link
- VCS Issuance deed of representation_01092018-05022020.pdfOpen →other · source link
- Gelibridge Hydropower Project_MR-final Clean.pdfDownload →monitoring · hosted copy · 1,035 KB
- MONIT_REP_656_06FEB2010_03OCT2010.pdfDownload →monitoring · hosted copy · 165 KB
- MR3-Gelibridge VCS656_01092018-05022020.pdfDownload →monitoring · hosted copy · 1,441 KB
- GelibridgeVCS-Project-Description-Final clean.pdfDownload →pdd · hosted copy · 941 KB
- PROJ_DESC_656_25NOV2010.pdfDownload →pdd · hosted copy · 314 KB
- PP_REG_REP_###_15DEC2010.pdfOpen →other · source link
- PP_REG_REP_656_15DEC2010.pdfOpen →other · source link
- VALID_REP_###_20MAY2011.pdfDownload →verification · hosted copy · 71 KB
- VALID_REP_###_29SEP2010.pdfDownload →verification · hosted copy · 638 KB
- VALID_REP_656_20MAY2011.pdfDownload →verification · hosted copy · 71 KB
- VALID_REP_656_29SEP2010.pdfDownload →verification · hosted copy · 638 KB
- VCS-Validation-Report-Gelibridge.pdfDownload →verification · hosted copy · 346 KB
- VALID_STA_656_20MAY2011.pdfDownload →verification · hosted copy · 36 KB
- VCS-Verification-Report-Gelibridge -VCS656- CTI.pdfDownload →verification · hosted copy · 352 KB
- Verification Report.pdfDownload →verification · hosted copy · 278 KB
- VERIF_REP_656_06FEB2010_03OCT2010.pdfDownload →verification · hosted copy · 129 KB
- VCS-Verification-Representation-v4.1-Gelibridge -VCS656.pdfDownload →verification · hosted copy · 105 KB
- VERIF_STA_656_06FEB2010_03OCT2010.pdfDownload →verification · hosted copy · 38 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia