The Cevizlik Run-of-River Hydroelectric Power Plant
Renewable Energy · Hydropower · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CarbonPlan: 'Verra should address its hydropower offsets problem' (Dec 2, 2025) — directly analyses VCS753 crediting gapDownload →other · hosted copy · 194 KB
- Global Energy Monitor — Cevizlik hydroelectric plant (Global Hydropower Tracker)Download →other · hosted copy · 39 KB
- Power-Technology — Power plant profile: Cevizlik, Turkey (GlobalData)Download →other · hosted copy · 259 KB
- VMR0017 Grid-connected electricity generation from renewable sources (ACM0002 Revision), v1.0 — VerraDownload →methodology · hosted copy · 151 KB
- Exemption_753_Approval_Letter.pdfOpen →other · source link
- VCS Project Review Report_753, CPR_17JAN2023_Final.pdfOpen →other · source link
- VCS Project Review Report_753 Verification_13 December 2022.pdfOpen →other · source link
- Cevizlik-Issuance Representation.pdfOpen →other · source link
- PP_ISS_REP_753_01JUL2011_30JUN2012.pdfOpen →other · source link
- PP_ISS_REP_753_29MAY2010_30JUN2011.pdfOpen →other · source link
- VCS-Issuance-Representation of Cevizlik HEPP.pdfOpen →other · source link
- VCS-Issuance Representation Single Representor.pdfOpen →other · source link
- Cevizlik HEPP Monitoring Report_v01.pdfDownload →monitoring · hosted copy · 3,132 KB
- Final_MR_635 Cevizlik hydro_v03_23-05-2021.pdfDownload →monitoring · hosted copy · 797 KB
- Final_MR_734 Cevizlik hydro_v05_01-12-2022.pdfDownload →monitoring · hosted copy · 711 KB
- MONIT_REP_753_01JUL2011_30JUN2012.pdfDownload →monitoring · hosted copy · 944 KB
- MONIT_REP_753_29MAY2010_30JUN2011.pdfDownload →monitoring · hosted copy · 708 KB
- PROJ_DESC_753_17JUN2010.pdfDownload →pdd · hosted copy · 6,538 KB
- VCS753_Cevizlik HEPP-PDD_12.09.2022_Verra Review.pdfDownload →pdd · hosted copy · 2,323 KB
- Cevizlik_vcs-registration-representation-single-representor-v4.2-final.pdfOpen →other · source link
- PP_REG_REP_753_24AUG2011.pdfOpen →other · source link
- VALID_REP_753_21JUN2011.pdfDownload →verification · hosted copy · 7,726 KB
- VCS.VAL.22.11_Cevizilik FVR_v3.0.pdfDownload →verification · hosted copy · 678 KB
- Validation Signed Deed.pdfDownload →verification · hosted copy · 108 KB
- VALID_STA_753_21JUN2011.pdfDownload →verification · hosted copy · 630 KB
- Final_Ver Report_635 Cevizlik hydro_Anil Soyler_v01_31-05-2021.pdfDownload →verification · hosted copy · 1,367 KB
- Final_Ver Report_734 Cevizlik hydro_v01.3_05-12-2022.pdfDownload →verification · hosted copy · 1,656 KB
- VCS_VER_REP_Cevizlik HEPP_23TQMD25_Rev 3.0Aa_31012024.pdfDownload →verification · hosted copy · 600 KB
- VERIF_REP_753_01JUL2011_30JUN2012.pdfDownload →verification · hosted copy · 11,121 KB
- VERIF_REP_753_29MAY2010_30JUN2011.pdfDownload →verification · hosted copy · 3,211 KB
- Signed_VCS Ver Rep_635 Cevizlik hydro_Christian Johannes_31-05-2021.pdfDownload →verification · hosted copy · 1,105 KB
- Signed_VCS Ver Rep_734 Cevizlik hydro_Christian Johannes_26-05-2022.pdfDownload →verification · hosted copy · 1,177 KB
- Verification-Representation-v4.2_753_signed_gioda_ZAY.pdfDownload →verification · hosted copy · 181 KB
- VERIF_STA_753_01JUL2011_30JUN2012.pdfDownload →verification · hosted copy · 18 KB
- VERIF_STA_753_29MAY2010_30JUN2011.pdfDownload →verification · hosted copy · 188 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia