Yangcun Hydropower Station Project
Renewable Energy · Hydropower · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- 1 VERRA REGISTRY USER GUIDEDownload →other · hosted copy · 1,367 KB
- 20 January 2022 VCS Standard v4.2Download →other · hosted copy · 1,041 KB
- VerraDownload →other · hosted copy · 112 KB
- PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive BoardDownload →pdd · hosted copy · 636 KB
- MONITORING REPORT: VCS Version 3 v3.2 1 MONITORING REPORTDownload →monitoring · hosted copy · 881 KB
- UNFCCC/CCNUCC CDM – Executive Board ACM0002 / Version 10 Sectoral Scope: 01Download →methodology · hosted copy · 358 KB
- MONITORING REPORT: VCS Version 3 v3.4 1 82 MW LAU RENUN HYDRODownload →monitoring · hosted copy · 4,668 KB
- 300062-1.pdfOpen →other · source link
- OTHER_77_06JAN2014.xlsOpen →other · source link
- SGS Report VCS 2007.1 Verification CCP.VOL0609.pdfOpen →other · source link
- SGS VCS Verification Statement CCP.VOL0609.pdfOpen →other · source link
- Yangcun_6th_VCS_Verification_Representation-2.pdfOpen →other · source link
- Yangcun_7th_VCS_Verification_Representation.pdfOpen →other · source link
- 091208_Yangcun Issuance Deed_3rd verification.pdfOpen →other · source link
- PP_ISS_REP_77_26DEC2012_25NOV2013.pdfOpen →other · source link
- PP_ISS_REP_77_26NOV2011_25DEC2012.pdfOpen →other · source link
- PP_ISS_REP_77_26NOV2011_25DEC2012.pdfOpen →other · source link
- 091104_final_Yangcun Monitoring Report (3rd monitoring period)-Simon Comments_jd_fei_pb_jd_jd_fh.pdfDownload →monitoring · hosted copy · 3,503 KB
- 300062-2.pdfDownload →monitoring · hosted copy · 66 KB
- 300062-4.pdfDownload →monitoring · hosted copy · 280 KB
- MONIT_REP_77_26DEC2012_25NOV2013.pdfDownload →monitoring · hosted copy · 3,058 KB
- MONIT_REP_77_26NOV2011_25DEC2012.pdfDownload →monitoring · hosted copy · 3,172 KB
- MONIT_REP_77_26NOV2011_25DEC2012.pdfDownload →monitoring · hosted copy · 3,172 KB
- MR_yangcun20121226-20131125.pdfDownload →monitoring · hosted copy · 3,013 KB
- 300062-3.pdfOpen →verification · source link
- 300062-5.pdfDownload →verification · hosted copy · 2,842 KB
- VCS verification report_Yangcun_7th_CTI.pdfDownload →verification · hosted copy · 281 KB
- VERIF_REP_77_26DEC2012_25NOV2013.pdfDownload →verification · hosted copy · 437 KB
- VERIF_REP_77_26NOV2011_25DEC2012.pdfDownload →verification · hosted copy · 284 KB
- VERIF_REP_77_26NOV2011_25DEC2012.PDFDownload →verification · hosted copy · 284 KB
- VERIF_STA_77_26NOV2011_25DEC2012.pdfDownload →verification · hosted copy · 39 KB
- Yangcun 7th_VCS Verification Representation.pdfDownload →verification · hosted copy · 39 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia