Sichuan Huadian Xixi River Hydro-electricity Development Co., Ltd. Diluo Hydroelectric Project
Renewable Energy · Hydropower · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Diluo Hydroelectric Project CDM PDD (original, approved 18 Dec 2012, ACM0002 v.12)Download →pdd · hosted copy · 1 KB
- Diluo Hydroelectric Project CDM PDD – Crediting Period Renewal (ACM0002 v.18, 988 KB)Download →pdd · hosted copy · 1 KB
- Appendix 1 – Diluo Hydropower ER v1.1 (emission reduction calculation spreadsheet)Download →other · hosted copy · 1 KB
- CDM Validation Report – LRQA Ltd (original, 284 KB)Download →verification · hosted copy · 1 KB
- CDM Validation Opinion – Crediting Period Renewal (249 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report: 15 Jun 2011 – 25 Apr 2012 (120 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report: 26 Apr 2012 – 31 Dec 2012 (116 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report: 01 Jan 2013 – 25 Jul 2016 (128 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project #4901 Registration Page (main project record, cp=1)Download →other · hosted copy · 1 KB
- CDM Crediting Period Renewal Record (cp=2, Jun 2018–Jun 2025)Download →other · hosted copy · 1 KB
- ACM0002 – Grid-connected electricity generation from renewable sources (active VCS version via Verra)Download →methodology · hosted copy · 151 KB
- COMMS_AGR_882_22JULY2012.pdfOpen →other · source link
- PP_ISS_REP_882_17DEC2009_14JUN2011.pdfOpen →other · source link
- MONIT_REP_882_17DEC2009_14JUN2011.pdfDownload →monitoring · hosted copy · 115 KB
- PROJ_DESC_882_11JUL2012.pdfDownload →pdd · hosted copy · 824 KB
- PROJ_DESC_882_19MAY2011.pdfDownload →pdd · hosted copy · 790 KB
- PP_REG_REP_882_15JUN2012.pdfOpen →other · source link
- VALID_REP_882_08AUG2012.pdfDownload →verification · hosted copy · 111 KB
- VALID_REP_882_31MAY2011.pdfDownload →verification · hosted copy · 284 KB
- VALID_STA_882_12AUG2012.pdfDownload →verification · hosted copy · 24 KB
- VERIF_REP_882_17DEC2009_14JUN2011.pdfDownload →verification · hosted copy · 511 KB
- VERIF_STA_882_17DEC2009_14JUN2011.pdfDownload →verification · hosted copy · 24 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBB210 MW Musi Hydro Power Plant, BengkuluIndonesia
- BBBTeesta- V Hydro Power project in SikkimIndia