Chuanwei Group 24 MW Waste Gas based Captive Power Plant
Industrial & Commercial · Waste Gas Recovery · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Chuanwei Group 24 MW Waste Gas based Captive Power Plant – Project Design Document (CDM-1470)Download →pdd · hosted copy · 1 KB
- Validation Report – DNV-CUK (CDM-1470)Download →verification · hosted copy · 1 KB
- Monitoring Report: 10 Sep 2008 – 31 Oct 2009 (CDM-1470)Download →monitoring · hosted copy · 1 KB
- Monitoring Report: 01 Nov 2009 – 25 Sep 2011 (CDM-1470)Download →monitoring · hosted copy · 1 KB
- EB Review Scope – EB40 Annex 5 (CDM-1470 Additionality Review)Download →other · hosted copy · 0 KB
- Project Participant (Energy Systems International B.V.) Response to CDM EB Review, 14 May 2008Download →other · hosted copy · 1 KB
- DOE (DNV) Response to CDM EB Review Request, 30 May 2008Download →other · hosted copy · 1 KB
- CDM Project 1470 History Page (issuance records, revised monitoring plan links)Download →other · hosted copy · 1 KB
- Communications Agreement-VCS12 (002).pdfOpen →other · source link
- transfer agreement-12 (002).pdfOpen →other · source link
- issuance representative v4.1.pdfOpen →other · source link
- VCS PP Issuance Representation_Chuanwei.pdfOpen →other · source link
- MonitoringReport198.pdfDownload →monitoring · hosted copy · 497 KB
- Chuanwei CDM PDD.pdfDownload →pdd · hosted copy · 648 KB
- PPRR for Grandparenting.pdfOpen →other · source link
- Chuanwei CDM Validation Report.pdfDownload →verification · hosted copy · 668 KB
- VER_Verification Report-Chuanwei WG 24MW_Approved (1).pdfDownload →verification · hosted copy · 207 KB
- VCS 12-Verification-Report-Chuanwei Group 24 MW Waste Gas Based Captive Power Plant_CTI.pdfDownload →verification · hosted copy · 430 KB
- VER_Verification Report-Chuanwei WG 24MW_Approved (1).pdfDownload →verification · hosted copy · 207 KB
- VCS-Verification-Representation-v4.1- Chuanwei Group 24 MW Waste Gas Based Captive Power Plant-CTI.pdfDownload →verification · hosted copy · 109 KB
- VER_Verification Report-Chuanwei WG 24MW_Approved (1).pdfDownload →verification · hosted copy · 207 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Waste Gas Recovery →- BBBThe Hyundai Waste Energy Recovery CO-Generation Project Phase IISouth Korea
- BBBAntai Group Waste Gas Recovery for Power Generation Project (300303)China
- BBBAssociated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat lbri of the Sultanate of OmanOman
- BBBMedcoEnergi Associated Gas Recovery and Utilization ProjectIndonesia
- BBBAssociated Gas Recovery and Utilization at Block 9Oman
- BBBNanba Associated Gas Processing Plant and the Auxiliary EngineeringChina