Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat lbri of the Sultanate of Oman
Industrial & Commercial · Waste Gas Recovery · Oman
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM Project Design Document – Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat Ibri, Sultanate of Oman (CDM Project 10584)Download →pdd · hosted copy · 1 KB
- PDD Appendix 1 – ER and IRR Sheet (CDM Project 10584)Download →other · hosted copy · 1 KB
- CDM Validation Report (VVS-PA 2.0) – CDM Project 10584, validated by Carbon Trust InternationalDownload →verification · hosted copy · 1 KB
- Monitoring Report 03 Aug 2020 – 15 Oct 2020 (CDM Project 10584)Download →monitoring · hosted copy · 1 KB
- Monitoring Report 16 Oct 2020 – 15 Nov 2020 (CDM Project 10584)Download →monitoring · hosted copy · 1 KB
- Monitoring Report 16 Nov 2020 – 15 Dec 2020 (CDM Project 10584)Download →monitoring · hosted copy · 1 KB
- AM0009 ver. 7 – Recovery and utilization of gas from oil fields that would otherwise be flared or vented (CDM Methodology)Download →methodology · hosted copy · 1 KB
- CDM Project 10584 Registry Page (full issuance history and document links)Download →other · hosted copy · 1 KB
- 11.CA.pdfOpen →other · source link
- B27_CA_OQVSA.pdfOpen →other · source link
- 1. CER to VCU statement.pdfOpen →other · source link
- 2. VCU-Conversion-Deed-of-Representation-v4.1.pdfOpen →other · source link
- 3. Attestation Letter 16 Oct 2020-15 Nov 2020.pdfOpen →other · source link
- 4. Attestation Letter 16 Nov 2020-15 Dec 2020.pdfOpen →other · source link
- 9. PDD.pdfOpen →other · source link
- 1st_issuance_representation.pdfOpen →other · source link
- VCS2768_vcs-issuance-representation_2nd.pdfOpen →other · source link
- B27_VCS-Listing_OQ.pdfOpen →other · source link
- 1st_MR_VCS2768_1.pdfDownload →monitoring · hosted copy · 692 KB
- 5. CDM MR 16 Oct 2020-15 Nov 2020 .pdfDownload →monitoring · hosted copy · 1,321 KB
- 6. CDM MR 16 Nov 2020-15 Dec 2020 .pdfDownload →monitoring · hosted copy · 1,322 KB
- VCS_MON_REP_2768_01JAN2021_31MAR2023.pdfDownload →monitoring · hosted copy · 810 KB
- 2768 VCS-Project-Description v2_clean.pdfDownload →pdd · hosted copy · 399 KB
- 2768 VCS-Project-Description v4_clean.pdfDownload →pdd · hosted copy · 441 KB
- VCS-Registration-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- 10. Validation report.pdfDownload →verification · hosted copy · 440 KB
- VCS-Validation-Report-Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27_clean.pdfDownload →verification · hosted copy · 278 KB
- VCS-Validation-Representation-v4.1.pdfDownload →verification · hosted copy · 182 KB
- 1st_FVR_VCS2768_1.pdfDownload →verification · hosted copy · 2,098 KB
- 7. CDM verification report 16 Oct 2020-15 Nov 2020.pdfDownload →verification · hosted copy · 992 KB
- 8. CDM Verification report 16 Nov 2020-15 Dec 2020.pdfDownload →verification · hosted copy · 1,094 KB
- VCS_VERIF_REP_2768_01JAN2021_31MAR2023.pdfDownload →verification · hosted copy · 597 KB
- 1st_VCS-Verification-Representation-v4.1_VCS2768_1.pdfDownload →verification · hosted copy · 105 KB
- VCS2768_VCS-Verification-Representation_2nd.pdfDownload →verification · hosted copy · 90 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Waste Gas Recovery →- BBBThe Hyundai Waste Energy Recovery CO-Generation Project Phase IISouth Korea
- BBBAntai Group Waste Gas Recovery for Power Generation Project (300303)China
- BBBChuanwei Group 24 MW Waste Gas based Captive Power PlantChina
- BBBMedcoEnergi Associated Gas Recovery and Utilization ProjectIndonesia
- BBBAssociated Gas Recovery and Utilization at Block 9Oman
- BBBNanba Associated Gas Processing Plant and the Auxiliary EngineeringChina